My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PERSHING
>
4444
>
2900 - Site Mitigation Program
>
PR0540885
>
SITE INFORMATION AND CORRESPONDENCE_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2020 9:19:48 AM
Creation date
4/10/2020 8:44:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0540885
PE
2960
FACILITY_ID
FA0023381
FACILITY_NAME
FORMER EXXON SERVICE STATION NO 73942
STREET_NUMBER
4444
Direction
N
STREET_NAME
PERSHING
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
11022017
CURRENT_STATUS
01
SITE_LOCATION
4444 N PERSHING AVE
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
554
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Harding Lawson Associates <br /> Log of Site Visits - Exxon Station 7-3942 <br /> 4444 North Pershing Street, Stockton, California <br /> September 9, 1986 Surveyed and sampled approximately 300 Cubic yams <br /> Of excavated soils; 24 samples for 6 composites. <br /> Samples delivered to laboratory. 10 hours <br /> September 18, 1986 Coordinated spreading of soils for aeration. <br /> Equipment could not excavate deeper (no extender <br /> arm) . AEMC excavated waste oil tank soils. <br /> Collected ground-water sample and delivered to <br /> laboratory. 12 hours <br /> September 23, 1986 AEMC excavating additional soils from gasoline tank <br /> excavation. Sampled excavation floor at 20-21 <br /> feet. Surveyed soil stockpile; 12 samples for 3 <br /> composites. Samples delivered to laboratory. <br /> 13 hours <br /> October 3, 1986 Screened stockpiles and collected 12 samples for 3 <br /> composites. Samples delivered to laboratory. <br /> 11 hours <br /> October 20, 1986 Sampled aerated soils. 5 hours <br /> November 13, 1986 Sampled aerated soils. 4 hours <br /> November 21, 1986 Sampled aerated soils. 4 hours <br />
The URL can be used to link to this page
Your browser does not support the video tag.