My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PERSHING
>
4444
>
2900 - Site Mitigation Program
>
PR0540885
>
SITE INFORMATION AND CORRESPONDENCE_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2020 9:19:48 AM
Creation date
4/10/2020 8:44:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0540885
PE
2960
FACILITY_ID
FA0023381
FACILITY_NAME
FORMER EXXON SERVICE STATION NO 73942
STREET_NUMBER
4444
Direction
N
STREET_NAME
PERSHING
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
11022017
CURRENT_STATUS
01
SITE_LOCATION
4444 N PERSHING AVE
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
554
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EIf�ON COMPANY, U.S.A. B4'tPUPt EFSARV <br /> ICEI.TfI <br /> P.O.BOX 4032•CONCORD,CA 94524-2032 <br /> MARKETING DEPARTMENT 93 AW, IS PPI 2: 10 <br /> FUEL PRODUCTS•BUS[NESS SERVICES <br /> ENVIRONMENTAL ENGINEERING <br /> MARLA D.GUENSLER <br /> SENIOR ENVIRONMENTAL ENGINEER <br /> (510)246-8776 <br /> (510)246-8798 FAX <br /> August 16, 1993 <br /> Via Facsimile <br /> Ms.Diane Filippi <br /> SM WM <br /> 501 Second Street <br /> San Francisco,CA 94107 <br /> RE: Former Exxon RAS#7-3942/4444 Pershing Blvd.,Stockton,CA <br /> Dear Ms. Filippi: <br /> Enclosed is a site plan of the above referenced site with a proposed layout of the remediation system enclosure and <br /> associated underground piping for your review and comment. Please communicate any changes or comments on the <br /> proposed layout by Monday,August 23, 1993. EA is progressing quickly with the design of the remediation system,and <br /> would like to finalize the layout by next week. <br /> If you have any questions,please contact me at(510)246-8776,or Mr.Gopi Chandran of EA at(510)283-7077. <br /> Sincerely, <br /> —) itMalia D.Guensler <br /> Senior Environmental Engineer <br /> MDG/mdg <br /> enclosure: Remediation System Site Layout <br /> cc: Mr.Gopi Chandran-EA <br /> Mr. Harlin Knoll-San Joaquin County Health <br /> A DIVISION OF EXXON CORPORATION <br />
The URL can be used to link to this page
Your browser does not support the video tag.