Laserfiche WebLink
4 i <br /> Less Than <br /> Potentially Significant Less Than <br /> Significant with Significant No <br /> Impact Mitigation Impact Impact <br /> VIII.HYDROLOGY AND WATER QUALITY—Would the project: <br /> a)Violate any water quality standards or waste discharge requirements? ❑ ❑ ❑ ❑ <br /> b) Substantially deplete groundwater supplies or interfere substantially ❑ ❑ ❑ ❑ <br /> with groundwater recharge such that there would be a net deficit in aquifer <br /> volume or a lowering of the local groundwater table level(e.g., the <br /> production rate of pre-existing nearby wells would drop to a level which <br /> would not support existing land uses or planned uses for which permits <br /> have been granted)? <br /> c)Substantially alter the existing drainage pattern of the site or area, ❑ ❑ ❑ ❑ <br /> including through the alteration of the course of a stream or river, in a <br /> manner which would result in substantial erosion or siltation on-or off- <br /> site? <br /> d) Substantially alter the existing drainage pattern of the site or area, ❑ ❑ ❑ ❑ <br /> including through the alteration of the course of a stream or river, or <br /> substantially increase the rate or amount of surface runoff in a manner <br /> which would result in flooding on-or off-site? <br /> e)Create or contribute runoff water which would exceed the capacity of ❑ ❑ ❑ ❑ <br /> existing or planned stormwater drainage systems or provide substantial <br /> additional sources of polluted runoff? <br /> f)Otherwise substantially degrade water quality? ❑ ❑ ❑ ❑ <br /> g)Place housing within a 100-year flood hazard area as mapped on a ❑ ❑ ❑ ❑ <br /> federal Flood Hazard Boundary or Flood Insurance Rate Map or other <br /> flood hazard delineation map? <br /> h)Place within a 100-year flood hazard area structures which would ❑ ❑ ❑ ❑ <br /> impede or redirect flood flows? <br /> i)Expose people or structures to a significant risk of loss, injury or death ❑ ❑ ❑ ❑ <br /> involving flooding, including flooding as a result of the failure of a levee <br /> or dam? <br /> j)Inundation by seiche,tsunami, or mudflow? ❑ ❑ ❑ ❑ <br /> IX. LAND USE AND PLANNING-Would the project: <br /> a)Physically divide an established community? ❑ ❑ ❑ ❑ <br /> b)Conflict with any applicable land use plan, policy,or regulation of an ❑ ❑ ❑ ❑ <br /> agency with jurisdiction over the project(including, but not limited to the <br /> general plan, specific plan, local coastal program,or zoning ordinance) <br /> adopted for the purpose of avoiding or mitigating an environmental effect? <br /> c)Conflict with any applicable habitat conservation plan or natural ❑ ❑ ❑ 0 <br /> community conservation plan? <br />