Laserfiche WebLink
ti 41, <br /> San Joaquin County <br /> Environmental QG Health Department DIRECTOR Donna Heran,REHS <br /> 1868 East Hazelton Avenue <br /> Stockton, California 95205-6232 PROGRAM COORDINATORS <br /> _ Robert McClellon,REHS <br /> ' Jeff Carruesco,REHS, RDI <br /> C'q�iFC1R�`P Website: www.sjgov.org/ehd Kasey Foley,REHS <br /> Phone: (209) 468-3420 Linda Turkatte, REHS <br /> Rodney Estrada, REHS <br /> Fax: (209) 464-0138 Adrienne Ellsaesser,REHS <br /> October 3, 2013 <br /> EXXONMOBIL EDNA FILIPPI FAMILY TRUST <br /> ENVIRONMENTAL SERVICES LIMITED PARTNERSHIP ETAL <br /> c/o JENNIFER SEDLACHEK c/o BANK OF STOCKTON, ROBERT FAY <br /> 4096 PIEDMONT AVE. # 194 P.O. BOX 1110 <br /> OAKLAND, CA 94611 STOCKTON, CA 95201 <br /> Subject: FORMER EXXON SERVICE STATION #7-3943 LOP SITE CODE: 2231 <br /> 4444 PERSHING AVE. <br /> STOCKTON, CA 95207 <br /> WORK PLAN: Work Plan (WP) for In Situ Chemical Oxidation <br /> DATED: September 9, 2013 <br /> PREPARED BY: Cardno ERI <br /> APPROVED— X <br /> DTSAPT9 OVED: <br /> ADUENDUM NEEDED: E Submit by: <br /> ADEQUATE AND NECESSARY ELEMENTS OF THE WORK PLAN [H&S 25296.10 (c)(3)]: <br /> 1. A clean water injection test will be performed on existing wells: UVB-MW1,UVB-MW2, <br /> V1, V2, V4, SW1, SW2, IP1A, IP1B, IP2A, IP213, IP3A, IP313, PSV1, and PSV2. The test <br /> is to evaluate current well condition and performance prior to oxidant (PersulfOx(D) <br /> injection. <br /> 2. If the evaluation of test wells UVB-MW1,UVB-MW2, V1, V2, V4, SW1, SW2, IP1A, <br /> IP1B, IP2A, IP213, IP3A, IP313, PSV1, and PSV2 is favorable, these wells will be used <br /> for the PersulfOx®injections. <br /> 3. Two PersulfOx®injection events into groundwater will be performed approximately three <br /> weeks apart . <br /> 4. A contaminant mass calculation in soil and groundwater in the treatment area is <br /> estimated to be 3,782 pounds and Regenesis (supplier of PersulfOx®) recommends <br /> 15,500 pounds of PersulfOx®will be needed for treatment. <br /> 5. The injection rate and pressure will be selected based upon the initial results of the <br /> clean water well injection test. <br /> 6. Groundwater monitoring and sampling will be conducted before, during, and after <br /> injections adhering to Appendix D in the WP. <br /> 7. Safeguards will be in place to address any spillage or overflow/breakthrough that occur <br /> on-site or off-site. <br /> 8. A minimal amount of clean water for flushing will be injected into the treated wells <br /> following the Persulfox®injections. <br /> 9. After completion of the field activities and one quarter of groundwater <br /> monitoring/sampling, a report of findings will be prepared and submitted for review and <br /> comment. <br />