My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0006125
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PERSHING
>
4444
>
2900 - Site Mitigation Program
>
PR0540885
>
ARCHIVED REPORTS_XR0006125
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2020 4:35:59 PM
Creation date
4/10/2020 2:12:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0006125
RECORD_ID
PR0540885
PE
2960
FACILITY_ID
FA0023381
FACILITY_NAME
FORMER EXXON SERVICE STATION NO 73942
STREET_NUMBER
4444
Direction
N
STREET_NAME
PERSHING
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
11022017
CURRENT_STATUS
01
SITE_LOCATION
4444 N PERSHING AVE
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
148
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> • ADDITIONAL ACTIVITIES PERFORMED AT SITE <br />' Selected groundwater samples were analyzed for additional analytes including selected metals, <br /> nitrate,fluoride, sulfate,chloride,chemical oxygen demand,total organic carbon,and total dissolved <br />' solids The laboratory analytical results are included in Appendix C and are presented in Table 6 <br />' WORK PROPOSED FOR NEXT QUARTER <br /> Groundwater will be monitored in accordance with the attached groundwater monitoring plan <br />' The UVB system will remain shut down <br />' If approved by the San Joaquin County Public Health Services, the Air Sparging Pilot Test Work <br /> Plan will be implemented <br /> I ' <br /> Attachments <br />' Figure 1 Site Plan Showing Groundwater Elevations and Analytical Results <br /> Figure 2 Site Map Showing Offsite Groundwater Monitoring Well Locations <br /> Figure 3 Influent TPH-g Concentrations and Estimated Mass of TPH-g Removed by UVB <br />'� System <br /> Figure 4 Influent Benzene Concentrations and Estimated Mass of Benzene Removed by <br /> UVB System <br />' Table 1 Well Construction Details <br /> Table 2 Groundwater Monitoring Data <br />' Table 3 Groundwater Monitoring Plan <br /> Table 4 Operation and Performance Data -WB System <br /> Table 5 Summary of Analytical Results - UVB System <br />' Table 6 Additional Groundwater Analytical Results <br /> Appendix A Field Protocols <br />' Appendix B Field Documents <br /> Appendix C Laboratory Analytical Reports <br /> 1 <br /> 1 <br />' g�prgccts1739421mmterN"\g070413942text doc 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.