Laserfiche WebLink
ADDITIONAL ACTIVITIES PERFORMED AT SITE <br />' No additional activities wereP erformed at the site <br /> WORK PROPOSED FOR NEXT QUARTER <br />' Groundwater will be monitored in accordance with the attached groundwater monitoring plan <br />' The UVB system will remain shut down <br /> ETIC submitted a feasibility study and work plan for well installation to San Joaquin County Public <br />' Health Services on 10 March 2003 <br />' Attachments <br /> Figure 1 Site Plan Showing Groundwater Elevations and Analytical Results <br /> Figure 2 Site Map Showing Offsite Groundwater Monitoring Well Locations <br />' Figure 3 Influent TPH-g Concentrations and Estimated Mass of TPH-g Removed by WB <br /> System <br /> Figure 4 Influent Benzene Concentrations and Estimated Mass of Benzene Removed by <br />' WB System <br /> Table 1 Well Construction Details <br />' Table 2 Groundwater Monitoring Data <br /> Table 3 Groundwater Monitoring Plan <br />' Table 4 Operation and Performance Data - UVB System <br /> Table 5 Summary of Analytical Results - UVB System <br />' Appendix A Field Protocols <br /> Appendix B Field Documents <br /> Appendix C Laboratory Analytical Reports <br /> 1 <br /> 1 <br /> 1 ' <br />' g 1pmjects173942Vn tcrlwpAI2020942text dui 5 <br />