Laserfiche WebLink
' ADDITIONAL ACTIVITIES PERFORMED AT SITE <br />' No additional activities were performed at the site <br />' WORK PROPOSED FOR NEXT QUARTER <br /> Groundwater will be monitored in accordance with the attached groundwater monitoring plan <br />' The UVB system will remain shut down <br />' Attachments <br /> Figure 1 Site Plan Showing Groundwater Elevations and Analytical Results <br />' Figure 2 Site Map Showing Offsite Groundwater Monitoring Well Locations <br /> Figure 3 Influent TPH-g Concentrations and Estimated Mass of TPH-g Removed by UVB <br /> System <br />' Figure 4 Influent Benzene Concentrations and Estimated Mass of Benzene Removed by <br /> UVB System <br />' Table 1 Well Construction Details <br /> Table 2 Groundwater Monitoring Data <br /> Table 3 Groundwater Monitoring Plan <br /> Table 4 Operation and Performance -WB System <br /> Table 5 Summary of Analytical Results - UVB System <br /> Appendix A Field Protocols <br /> Appendix B Field Documents <br />' Appendix C Laboratory Analytical Reports <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> i <br /> 1 <br /> 1 g 5projects%739425rnwier�wplgo3o213942text do; 3 <br />