Laserfiche WebLink
' ADDITIONAL ACTIVITIES PERFORMED AT SITE <br />' Wells associated with this site were surveyed in October 2001 by a licensed land surveyor <br />' WORK PROPOSED FOR NEXT QUARTER <br /> Groundwater will be monitored in accordance with the attached groundwater monitoring plan <br /> The UVB system will remain shut down to evaluate post-remediation groundwater monitoring data <br /> Attachments <br /> Figure 1 Site Plan Showing Groundwater Elevations and Analytical Results <br />' Figure 2 Site Map Showing Offsite Groundwater Monitoring Well Locations <br /> Figure 3 Influent TPH-g Concentrations and Estimated Mass of TPH-g Removed by UVB <br /> System <br />' Figure 4 Influent Benzene Concentrations and Estimated Mass of Benzene Removed by <br /> WB System <br />' Table 1 Well Construction Details <br /> Table 2 Groundwater Monitoring Data <br />' Table 3 Groundwater Monitoring Plan <br /> Table 4 Operation and Performance Data for LTVB System <br /> Table 5 Summary of Analytical Results for UVB System <br /> Appendix A Field Protocols <br /> Appendix B Field Documents <br /> Appendix C Laboratory Analytical Report <br /> i <br /> G 1Projectsk739421MASTERI WP\Q 120113942text da 3 <br />