Laserfiche WebLink
• quarter of 2000 The system was shut down on 22 September 2000 as proposed during the 12 <br /> September 2000 meeting between San Joaqum County Public Health Services and ExxonMobil As <br /> of 22 September 2000, approximately 1,916 pounds of TPH-g have been stripped from the <br /> groundwater Table 2 provides a summary of 2000 field data and laboratory analytical results for <br /> the UVB system A graphic representation of the WB system performance to date is shown in <br /> IFigure 3 <br /> 4. WORK PROPOSED FOR NEXT QUARTER <br /> IDepths to water will be measured and groundwater samples will be collected in December 2000 <br /> The samples will be analyzed for TPH-g, BTEX, and MTBE <br /> IA risk assessment work plan for the site was submitted to the San Joaquin County Public Health <br /> Services in October 2000 The proposed work is scheduled to be performed in December 2000 <br /> I <br /> I <br /> I <br /> I <br /> i <br /> I <br /> I <br /> 1 <br /> 1 <br /> I <br /> I <br /> i <br /> I <br /> F\Pinj ecLs V 3942\MASTER\W P\Q900\IC doc 2 <br /> 1 <br />