Laserfiche WebLink
' EXXON WELL MONITORING DATA SHEET <br />' Project #: 1 Z ob - /1 , Store # 7- 3 9► 4 Z <br /> Samplerj��-- 1 S /M A Date r 2. - 6 ci '9 <br /> Well I D 2 W Well Diameter 2 3 4 6 8 <br />' Total Well Depth Depth to Water <br /> Depth to Free Product Thickness of Free Product (feet) <br /> IReferenced to C PVC Grade DO Meter (if req'd) YS1 HACH <br /> Well Diameter Mullinher Well Diameter Multiplier <br /> I 2' 0 16 5" 1 02 <br /> 3 037 6 1 47 <br /> V 065 Other radius'`0 163 <br />' Purge Method Bailer Sainpling Method Bailer <br /> Disposable Bailer Disposable Bailer <br /> Middleburg Extraction Port <br />' Electric Submersible Other <br /> Extraction Pump <br /> Other <br />' X = Gals <br /> I Case Volume(Gals) Specified Volumes Calculated Volume <br />' Time Temp CF) PH Cond Gals Removed Observations <br /> Um 4 S 40 <br /> Did well dewatei? Yes No Gallons actually evacuated <br /> Sampling Time Sampling Date /Z - 6 - 9( <br /> Sample I D Laboratory Sequoia Other,SQL <br /> Analyzed fol_ TPU -G B rcx MTB TPH-D Other <br /> O (if ieq'd) Pre-purge me�� Post-purge <br /> OR P (if req'd) Pre-purge mV Post-purge mV <br /> I <br />