Laserfiche WebLink
i <br /> t <br /> to an activated carbon abatement system After modification of the vapor abatement system, the <br /> UVB system was restarted on 25 March 1999 and operated almost continuously through 4 June <br /> 1999 Since the initial start-up of the UVB system, approximately 558 pounds of TPH-g have been <br /> stripped from the groundwater Table 2 provides a summary of field data and laboratory analytical <br /> I results for the UVB system A graphic representation of the WB system performance to date is <br /> shown in Figure 4 <br /> 4. WORK PROPOSED FOR NEXT QUARTER <br /> Depths to water will be measured and groundwater samples will be collected in May 1999 The <br /> samples will be analyzed for TPH-g, BTEX, and MTBE <br /> The UVB system will continue to be operated and monitored and results reported in the next <br /> quarterly report <br /> i <br /> i <br /> i <br /> I <br /> I <br /> I <br /> IF 1Pmj"N73942\M s,STER\WKQ399\ix do 2 <br />