My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0006192
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PERSHING
>
4444
>
2900 - Site Mitigation Program
>
PR0540885
>
ARCHIVED REPORTS_XR0006192
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2020 3:56:15 PM
Creation date
4/10/2020 2:36:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0006192
RECORD_ID
PR0540885
PE
2960
FACILITY_ID
FA0023381
FACILITY_NAME
FORMER EXXON SERVICE STATION NO 73942
STREET_NUMBER
4444
Direction
N
STREET_NAME
PERSHING
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
11022017
CURRENT_STATUS
01
SITE_LOCATION
4444 N PERSHING AVE
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 WORK PROPOSED FOR NEXT QUARTER <br /> Groundwater elevations will be measured and groundwater samples will be collected in May <br /> 1998 The samples will be analyzed for TPH-g, BTEX, and MTBE <br /> Five wells (P1, MWI, MW2, MW12, and MW 13) are subject to a less frequent sampling <br /> Because of the proximity of wells IW 1 and MW4, well P 1 is sampled only twice a year <br /> Similarly, because of the proximity of wells IW 1 and RW2, well MW2 is sampled only twice a <br /> year On the same basis, well MW1 is sampled only twice a year, because of its proximity to <br /> well P2 Petroleum hydrocarbons have not been detected in groundwater samples from well <br /> MW12 since April 1992 Petroleum hydrocarbons were last detected in well MW13 in August <br /> 1994 Therefore,the sampling frequency for both wells MW12 and MW13 is now once a year <br /> During the May 1998 sampling event, wells PI, MW 1, MW2, MW12, and MW 13 will not be <br /> sampled All the other wells will be sampled <br /> The UVB system will be operated and monitored and results reported in the next quarterly report <br /> EA will prepare a comprehensive assessment of remedial progress report The report will <br /> summarize the performance of the SVE system (in operation from May 1994 to November 1996) <br /> in the remediation of the vadose zone and the performance of the UVB system (from February <br /> 1997 to date) 1n groundwater remediation and migration control <br /> WP61 11941 Q398 TX 2 a <br />
The URL can be used to link to this page
Your browser does not support the video tag.