Laserfiche WebLink
4.3 CONCLUSIONS AND RECOMMENDATIONS <br />' The performance of the UVB system at former Exxon RS 7-3942 during the first 5 weeks of <br /> operation indicates that the system has a high stripping efficiency, which resulted in a high rate of <br /> petroleum hydrocarbon recovery from groundwater <br /> The performance of the UVB system operation will continue to be monitored and will be <br />' reported to the quarterly groundwater monitoring reports EA recommends that a tracer study be <br /> conducted after 6 months of operation to verify the size of the circulation cell and the width of <br /> the capture zone presented in the design calculations of the Groundwater Remediation System <br />' Technical Plan (EA 1996) <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> WP61 71942 R01397 3 13 <br />