My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0006208
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PERSHING
>
4444
>
2900 - Site Mitigation Program
>
PR0540885
>
ARCHIVED REPORTS_XR0006208
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2020 5:00:54 PM
Creation date
4/10/2020 2:47:00 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0006208
RECORD_ID
PR0540885
PE
2960
FACILITY_ID
FA0023381
FACILITY_NAME
FORMER EXXON SERVICE STATION NO 73942
STREET_NUMBER
4444
Direction
N
STREET_NAME
PERSHING
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
11022017
CURRENT_STATUS
01
SITE_LOCATION
4444 N PERSHING AVE
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The analytical results for the samples collected on 24 August are presented in boldface type in <br /> Table 1, along with previous data The laboratory analytical report and chain-of-custody <br /> documentation are included as Appendix B <br /> Detectable concentrations of petroleum hydrocarbons in the samples ranged from SS Q� <br /> (MW5) { <br /> to 100,000,uglL (RW3) for TPH-g For benzene, they ranged from 6 2µglL(P2) to <br /> 9,600µg/L(RW3) The concentration of TPH-g in the sample collected from MWS, located <br /> adjacent to the Shell service station and upgradient of the site, was 65,000 ,ug/L Groundwater <br /> sample analytical results are indicated in Figure 1 <br /> The soil vapor extraction and air sparging system operated continuously through the quarter <br /> Influent and effluent vapor concentrations from monthly self-monitoring are shown in Table 2 <br /> 3. WORK PROPOSED FOR NEXT QUARTER <br /> Groundwater elevations will be measured, and groundwater samples will be collected in <br /> November 1995 The samples will be analyzed for TPH-g and BTEX The soil vapor extraction <br /> and air sparging system will continue to be operated and its progress monitored <br /> r <br /> i <br /> r <br /> WP61 73942QS95 3 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.