My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0006230
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PERSHING
>
4444
>
2900 - Site Mitigation Program
>
PR0540885
>
ARCHIVED REPORTS_XR0006230
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2020 5:18:20 PM
Creation date
4/10/2020 2:53:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0006230
RECORD_ID
PR0540885
PE
2960
FACILITY_ID
FA0023381
FACILITY_NAME
FORMER EXXON SERVICE STATION NO 73942
STREET_NUMBER
4444
Direction
N
STREET_NAME
PERSHING
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
11022017
CURRENT_STATUS
01
SITE_LOCATION
4444 N PERSHING AVE
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. OPERATION OF THE UVB SYSTEM <br />' 4.1 SAMPLING INTERVALS AND REPORTS <br /> 41.1 Baseline <br />' Prior to startup, selected groundwater wells will be monitored for the applicable parameters <br /> described in Section 4 2 <br /> 4.1.2 General Operation <br /> All wells selected as system monitoring wells, and also the UVB pressure-side offgas port, will <br /> be sampled, analyzed, and measured (as appropriate) for the parameters listed in Section 4 2 on a <br /> quarterly basis, and the data will be reviewed to maintain optimum operating efficiency <br /> During and after initial startup, through the first two weeks, only designated nearby wells and <br />' influent and effluent vapor ports will be measured for the parameters stated in Section 4 2, <br /> • prior to startup (to establish a baseline for evaluation of the system) <br />' • within 24 hours after startup <br /> • 7 and 14 days from startup <br /> The startup period consists of the first 2 weeks from initial turn-on All analyses during the <br /> startup period will be performed within 7 days of sampling, and the information will be reviewed <br /> for any necessary adjustment in order to have an effective and efficient start of the system <br /> All analytical data will be entered ons spreadsheets and graphed These data will be evaluated <br /> P � p <br /> quarterly to maintain the system at its optimum efficiency and to determine when acceptable <br />' contaminant levels are reached <br />' 4.2 MONITORING PARAMETERS AND PROCEDURES <br /> Monitoring wells will be purged prior to sampling, in accordance with the existing quarterly <br /> groundwater monitoring plan <br /> 4.2.1 Vapor Parameters Measured <br />' 4.2.1.1 Effluent Vapor <br />' All parameters listed below will be measured from the pressure side of the UVB blower before <br /> offgas treatment begins The sampling port will be approximately 18 inches out from the <br /> effluent port on the blower and approximately 12 inches before any union <br /> 1 Relative humidity (optional) <br /> 2 Air temperature (optional) <br />' WP61 73942 WPI096 TX 5 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.