My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0006230
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PERSHING
>
4444
>
2900 - Site Mitigation Program
>
PR0540885
>
ARCHIVED REPORTS_XR0006230
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2020 5:18:20 PM
Creation date
4/10/2020 2:53:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0006230
RECORD_ID
PR0540885
PE
2960
FACILITY_ID
FA0023381
FACILITY_NAME
FORMER EXXON SERVICE STATION NO 73942
STREET_NUMBER
4444
Direction
N
STREET_NAME
PERSHING
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
11022017
CURRENT_STATUS
01
SITE_LOCATION
4444 N PERSHING AVE
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONTENTS <br /> LIST OF FIGURES <br /> SITE CONTACTS <br /> 1 INTRODUCTION I <br /> 2 UVB SYSTEM COMPONENTS 2 <br /> 2 1 TREATMENT SYSTEM 2 <br />' 2 2 UVB SYSTEM GENERAL DESCRIPTION 2 <br /> 2 3 UVB MONITORING WELLS 3 <br /> 3 PARAMETERS AND ASSUMPTIONS WHICH AFFECT THE UVB SYSTEM <br /> OPERATION 4 <br />' 3 1 DESIGN PARAMETERS 4 <br /> 3 1 1 Circulation Cell, Capture Zone, and Release Zone for Former Exxon <br /> RS 7-3942 4 <br /> 3 12 Hydrogeologic Parameters and System Construction Specifications 5 <br /> 32 CALCULATED OPERATIONAL AFFECTS 5 <br /> 3 2 1 Circulation Cell, Capture Zone and Release Zone 5 <br />' 3 2 2 Time of Circulation Within Cell 6 <br /> 3 2 3 Volatile Organics Removal b <br /> 4 OPERATION OF THE UVB SYSTEM 7 <br /> 4 1 SAMPLING INTERVALS AND REPORTS 7 <br /> 411 Baseline 7 <br />' 412 General Operation 7 <br /> 42 MONITORING PARAMETERS AND PROCEDURES 7 <br /> 4 2 1 Vapor Parameters Measured 7 <br /> 4 2 2 Groundwater Parameters Measured from UVB Observation Wells 8 <br /> 5 BIOREMEDIATION 10 <br /> 5 1 MICROBIAL ENUMERATION AND ACTIVITY 10 <br /> 5 1 1 Heterotrophic Plate Counts 10 <br /> 5 12 Epifluorescence Microscopy 10 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.