Laserfiche WebLink
t <br /> 16 APPENDIX D <br /> BLOWER <br /> An ELEKTROR HRD 2/5 centrifugal blower with a 208-volt, 3-phase motor will be installed for <br /> the UVB system A 5 HP blower is required to maintain a UVB 400 system at a vacuum of <br /> 20 inches of water The blower is equipped with a moisture knock-out vessel built into the <br /> HDPE blower enclosure The moisture knock-out vessel operates as an air stripping unit to <br /> remove dissolved volatile petroleum fuel hydrocarbons from the condensation water The <br /> off-gas effluent from the moisture knock-out will be discharged, along with off gas from the <br /> borehole, to the existing oxidizer treatment unit <br /> r <br />' WP61 73942 WP1096 TX 2 1 <br />