Laserfiche WebLink
' 10 1996 r 1-1PII IEE TECHROLOGIES No 39;'1 P _2!51 <br /> Y <br /> Z <br /> 4. Start of operation Retightening of the V-belts for models HRD <br /> 41 If the rated current indicated on the follows HRD 7/23 is to be carred out as <br /> rating plate ist being exceeded during <br /> Operation, it should be checked whet- 510 Remove drive belt guard, item 7 <br /> her the available supply voltage and 511 Loosen hexagonal nut, item 10, adjust <br /> t frequency are in accordance with the tension of V belts by tightening or <br /> embossed data Some blowers cannot loosening the adjusting screw, item 11 <br /> be operated with free air flow (see (see instruction plate), accordingly <br /> catalogue) and if in such a case the 512 Tighten hexagonal nut, item 10 <br /> system's resistance is too small, cur- 513 Reassemble drive belt guard, item 7 <br /> rent absorption will become too high 514 Attention should be given to exact <br /> y and an overload of the motor will occur alignment of the V-belt pulleys <br /> x By fitting a throttle flap on the intake or <br /> discharge side of the blower the volu- <br /> me flow will be reduced and an overlo- <br /> ad avoided 6. Repairs <br /> 19 <br /> 61 Repair work on blowers should <br /> generally be done in the factory only <br />' k <br /> S. Maintenance - , Exceptionally repairs may be carried <br /> € out in a workshop possessing the <br /> High pressure blowers are equipped with necessary qualifications and facilities <br /> enclosed grooved ball bearings which do Units with an explosion-proof motor <br /> not need lubrication. The grease filling is must be repaired by the manufacturer <br /> sufficient or the whole service life of the only. <br /> bearings <br /> l Tension control of the V-belts is to be car- <br /> ned out in accordance with the indicated <br /> values on the rating plate They are fixed to 7 Warranty, technical details <br /> the support flange, item 8, to the blower It <br /> 71 Legal warranty begins with the day of <br /> flange, item 6, respectively to the blower, , shipment <br /> base, item 5 72 Our warranty is valid only if the instruc- <br /> Retightening of the V-beats for models tions or installation and <br /> operation are <br /> HRD 1/2 - HRD 2/5 is to be carved out as strictly adhered to <br /> follows 73 Technical details regarding installation, <br /> 5.1 Remove cover guard, dem 10 I operating conditions and electrical <br /> connections may be obtained from the <br /> 52 Loosen hexagonal nut, item 18 <br /> 53. Increase tension of V-belts by tighten company's experts <br />' ing hexagonal nut~ item 19 <br /> (see rating plate) ' <br /> 54 Tighten hexagonal nut, item 18 <br />' <br /> 55 Reassemble cover guard, item 18 6• Spare parts list <br /> Retightening of the V-belts for models HRD When ordering spare parts please state <br /> 65/2 - HRD 65/7, HRD 60/3 and HRD 60/ serial number of the unit, type and part <br /> 5 is to be carried out as follows number in accordance with the following <br /> 56 Remove drive belt guard, item 7 lists and drawings <br /> 57 Adjust tension of V-belts by loosening <br /> or tightening nuts on the threaded bolt, <br /> item 10 (see rating plate) <br /> 58 Retighten hexagonal nuts on threaded <br /> bolt, item 10 <br /> 59- Reassemble drive belt guard, item 7 <br />