My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0006239
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PERSHING
>
4444
>
2900 - Site Mitigation Program
>
PR0540885
>
ARCHIVED REPORTS_XR0006239
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2020 5:06:30 PM
Creation date
4/10/2020 3:03:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0006239
RECORD_ID
PR0540885
PE
2960
FACILITY_ID
FA0023381
FACILITY_NAME
FORMER EXXON SERVICE STATION NO 73942
STREET_NUMBER
4444
Direction
N
STREET_NAME
PERSHING
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
11022017
CURRENT_STATUS
01
SITE_LOCATION
4444 N PERSHING AVE
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
198
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
All data collected during inspection and monitoring will be recorded in a logbook that will be <br /> filed on the site, copies of the logbook will be kept in the EA office Groundwater from all exist- <br /> ing wells will be sampled and analyzed to satisfy quarterly report requirements of the Regional <br /> Water Quality Control Board. The proposed monitoring and sampling schedule is as follows <br /> Week 1 daily monitoring with effluent sample collection and analysis (5 days) <br /> Weeks 2-4 twice per week for system monitoring and adjustment, trouble-shooting, <br /> and analysis <br />' Weeks 5-26 one day per week for system monitoring and adjustment and data logging. <br /> EA will prepare a report for Exxon on the system's installation and operation after one month of <br /> operation. The report will include figures, photographs, and as-built drawings of the ground- <br /> water treatment system and the associated plumbing and construction layout A second report <br />' will be prepared after six months of operation <br /> 1 <br /> CWw5 3942rJuf91la 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.