Laserfiche WebLink
CONTENTS <br /> 1 INTRODUCTION 1 <br /> 11 Setting 2 <br /> 12 Site Hydrogeology 2 <br />' <br /> 13 Status of Petroleum Hydrocarbons in the Soil and Groundwater 4 <br /> 14 Well/Aquifer Hydraulics 5 <br /> 2. TECHNICAL APPROACH AND SCOPE 11 <br /> 21 Scope of Work and Technical Approach for Groundwater Remediation 12 <br /> 22 Task I- Installation of One Groundwater Recovery Well, Two Down- <br /> gradient Monxtonng Wells,One Injection Well, and Two Piezometers 13 <br /> 23 Task II - Determination of Groundwater Chemistry 14 <br /> 24 Task III- Groundwater Treatment System Permitting and Final Design 14 <br />' <br /> 25 Task IV - System Construcuon and Installation 14 <br /> 26 Task V - System Startup,Operation, Maintenance, and Reporting 16 <br />' 3 REFERENCES 18 <br /> APPENDIX A Soil Boring Logs <br /> APPENDIX B- Bail Test Data and Interpretation <br /> APPENDIX C• Laboratory Analytical Reports <br /> APPENDIX D- Operation and Maintenance Manual <br /> r <br /> i <br /> i <br />