My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0006240
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PERSHING
>
4444
>
2900 - Site Mitigation Program
>
PR0540885
>
ARCHIVED REPORTS_XR0006240
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2020 3:52:40 PM
Creation date
4/10/2020 3:05:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0006240
RECORD_ID
PR0540885
PE
2960
FACILITY_ID
FA0023381
FACILITY_NAME
FORMER EXXON SERVICE STATION NO 73942
STREET_NUMBER
4444
Direction
N
STREET_NAME
PERSHING
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
11022017
CURRENT_STATUS
01
SITE_LOCATION
4444 N PERSHING AVE
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 M?,(DM COMPANY, U S A F'f+{ i ISER ICE <br /> P O BOX 4032 CONCORD,CA 94524-2032 113 SEP "0 ppb ' <br /> ENVIRONMENTAL ENGINEERING `+' �� �� ! <br /> MARLA D GUENSLER <br /> SENIOR ENVIRONMENTAL ENGINEER <br /> (510)246-8776 ` <br /> (510)246-8798 FAX <br /> September 26, 1993 j <br /> Mr Harlin Knoll <br /> San Joaquin County Public Health Services 11 <br /> Environmental Health Division <br /> 445 North San Joaquin Street + , <br /> Stockton,CA 95201 <br /> RE Former Exxon RAS#7-3942, 4444 North Pershing Avenue, Stockton,CA <br /> Dear Mr Knoll <br /> Attached for your review and comment is a report entitled Report of Quarterly Sampling nd Analysis for the above <br /> referenced site This report,prepared by EA Engineering, Science, and Technology, (EA)of Lafayette,California, <br /> details the results of the quarterly groundwater monitoring event which occurred in the Third Quarter 1993 <br /> EA is currently completing the permitting of the remediation to be installed at the site in the near future All equipment <br /> for the installation has been ordered for delivery to the site Also,bid packages for the construction phase were sent out <br /> } recently A contractor will be selected in the near future Exxon will communicate further updates as appropriate <br /> / If you have any questions or comments, please contact me at the above listed phone number <br /> Sincerely, <br /> w�Mark D GuensIer <br /> Senor Environmental Engineer <br /> MDG/mdg <br /> cc w/enclosure <br /> Ms Diane Filippi- SMWM R <br /> Ms Elizabeth Thayer-Central Vaftey Region CRWQCB-w/copy of EA QM Report dtd June 1993 <br /> s` <br /> W/o enclosure <br /> Mr Hugh Miles-EA Engineering K i <br /> a 739421tr doc <br /> i <br /> A DIVES ION OF EXXON gPRPORATION <br /> � 111 <br />
The URL can be used to link to this page
Your browser does not support the video tag.