My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_ROY'S AUTO - HISTORICAL
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MINER
>
3570
>
2900 - Site Mitigation Program
>
PR0527444
>
ARCHIVED REPORTS_ROY'S AUTO - HISTORICAL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2020 4:53:44 PM
Creation date
4/10/2020 4:05:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
ROY'S AUTO - HISTORICAL
RECORD_ID
PR0527444
PE
2950
FACILITY_ID
FA0018586
FACILITY_NAME
FORMER ROY KNOLL TOWING
STREET_NUMBER
3570
Direction
E
STREET_NAME
MINER
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
APN
14339014
CURRENT_STATUS
01
SITE_LOCATION
3570 E MINER AVE
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
363
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
##EO-95-007-PP <br /> SaTATE OF CAUFORNIA—CAUFORNIA ENVIRONMENTAL PROTECTION AGENCY PETE WILSON,Governor <br /> DEPARTMENT OF TOXIC SUBSTANCES CONTROL <br /> 400 P STREET.4TH FLOOR .. <br /> P.O.BOX 806 <br /> i' <br /> SACRAMENTO.CA 95812.0806 <br /> APPENDIX II-A <br /> PRELIMINARY NONBINDING ALLOCATION OF RESPONSIBILITY <br /> Health and Safety Code (HSC) section 25356.1 (e) requires the <br /> Department of Toxic Substances Control (DTSC) to prepare a preliminary <br /> nonbinding allocation of responsibility (the "NBAR") among all <br /> identifiable potentially responsible parties (PRPs) : HSC section <br /> 25356 .3 (a) allows PRPs with an aggregate allocation in excess of 50% <br /> to convene an arbitration proceeding by submitting to binding <br /> arbitration before an arbitration panel . If PRPs with over 50% of the <br /> allocation convene arbitration, then any other PRP wishing to do so <br /> may also submit to binding arbitration. <br /> The sole purpose of the NBAR is to establish which PRPs will <br /> have an aggregate allocation in excess of 50% and can therefore <br /> convene arbitration if they so choose. The NEAR, which is based on <br /> the evidence available to the DTSC, is not binding on anyone, <br /> including PRPs, DTSC, or the arbitration panel . If a panel is <br /> convened, its proceedings are de novo and do not constitute a review <br /> .- of the provisional allocation. The arbitration panel' s allocation <br /> will be based on the panel' s application of the criteria spelled out <br /> in HSC section 25356 .3 (c) to the evidence produced at the arbitration <br /> hearing. Once arbitration is convened, or waived, the NEAR has no <br /> further effect, in arbitration, litigation or any other proceeding, <br /> except that both the NBAR and the arbitration panel' s allocation are <br /> admissible in a court of law, pursuant to HSC section 25356 . 7 for the <br /> sole purpose of showing the good faith of the parties who have <br /> discharged the arbitration panel's decision. <br /> DTSC sets forth the following preliminary nonbinding allocation <br /> of responsibility for the [name] site : <br /> [Name of RP] is allocated [percentage] responsibility; [name of <br /> RP] is allocated [percentage] responsibility [name of RP] is <br /> ` allocated [name of RP] ; etc. <br /> 18 - 11/161,n <br /> MW <br /> • <br /> AV~MRKyv.pP o <br />
The URL can be used to link to this page
Your browser does not support the video tag.