Laserfiche WebLink
clearance is obtained for all components. In addition, if a sample outside a containment <br /> area fails clearance, collect additional floor samples outside the containment area, at a <br /> further distance from the airlock, during the re-testing. <br /> RE-EVALUATION SCHEDULE <br /> When lead-based paint is removed during abatement, successful clearance testing <br /> after application is all that is recommended. When lead-based paint remains at the <br /> residence, re-evaluation testing is recommended in addition to clearance testing. For <br /> enclosures, re-evaluation testing is recommended ten years after treatment. For <br /> encapsulation, re-evaluation testing is recommended one year after application, and then <br /> every three years afterwards. For interim controls, re-evaluation testing is recommended <br /> every 12 months after application. If a mixture of methods is used in a room or area, the <br /> most stringent schedule for re-evaluation testing is recommended. <br /> 4 <br />