Laserfiche WebLink
11.6 Health and Safety Plan <br /> A Health and Safety Plan prepared by Ground Zero Analysis was submitted to San Joaquin <br /> County Public Health Services, Environmental Health Division at an attachment to the Workplan <br /> for Soil Sampling at Roy's Towing dated September 30, 1996. <br /> The Health and Safety Plan was developed specifically for activities related to investigation and <br /> remediation of soils at the subject site. The plan was based on the requirements of 29 CFR <br /> 1910.120, "Hazardous Waste Operations and Emergency Responses". <br /> This Health and Safety Plan will remain in force and all contractors will be required to comply <br /> with its provisions during any site activities involving potential exposure to hazardous <br /> substances. Personnel involved in site activities potentially involving exposure to hazardous <br /> waste will be required to have completed the 40 hour training specified in 29 CFR 1910. <br /> The potential generation of dust during site activities will be minimized by the application of <br /> water to the soil. <br /> 11.7 Cost <br /> The estimated cost to implement the selected remedy is $33,500. Attachment 1 contains details <br /> on the preliminary cost estimate. <br /> 12.0 SCHEDULE <br /> A preliminary schedule for the completion of the project is included in Attachment 2. The final <br /> schedule will be influenced by the availability of contractors, regulatory approval and weather. <br /> rot's\reports\rnw.tpt 12 <br />