My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
14749
>
2231-2238 – Tiered Permitting Program
>
PR0515788
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2020 5:28:51 PM
Creation date
4/10/2020 5:18:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2231-2238 – Tiered Permitting Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0515788
PE
2832
FACILITY_ID
FA0000482
FACILITY_NAME
3 b's truck & auto plaza
STREET_NUMBER
14749
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
Rd
City
Lodi
Zip
95242
APN
000-027-346-4
CURRENT_STATUS
01
SITE_LOCATION
14749 N Thornton Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Spill Prevention Control and Countermeasures Plan <br /> THREE B'S TRUCK & AUTO PLAZA <br /> 14749 North Thornton Road, Lodi, California <br /> TABLE OF CONTENTS <br /> SECTION PAGE <br /> 3.0. DISCHARGE PREVENTION - GENERAL SPCC PROVISIONS..........................9 <br /> 3.1. COMPLIANCE WITH APPLICABLE REQUIREMENTS - 40 CFR 112.7(a)(2)... 9 <br /> 3.2. FACILITY LAYOUT DIAGRAM - 40 CFR 112.7(a)(3) ...................................... 10 <br /> 3.3. SPILL REPORTING - 40 CFR 112.7(a)(4)....................................................... 10 <br /> 3.4. POTENTIAL DISCHARGE VOLUMES AND DIRECTION OF FLOW - 40 CFR <br /> 112.7(b).............................................................................................................. 10 <br /> 3.5. CONTAINMENT AND DIVERSIONARY STRUCTURES - 40 CFR 112.7(c) ... 10 <br /> 3.5.1. Spill Pallets................................................................................................ 10 <br /> 3.5.2. Unloading Area.......................................................................................... 11 <br /> 3.5.3. Transfer Areas........................................................................................... 11 <br /> 3.5.4. Drainage System ....................................................................................... 11 <br /> 3.6. PRACTICABILITY OF SECONDARY CONTAINMENT - 40 CFR 112.7(d)...... 11 <br /> 3.7. INSPECTIONS, TESTS, AND RECORDS - 40 CFR 112.7(e) ......................... 11 <br /> 3.7.1. Daily Inspection ......................................................................................... 12 <br /> 3.7.2. Monthly Inspection..................................................................................... 12 <br /> 3.7.3. Annual Inspection ...................................................................................... 12 <br /> 3.7.4. Periodic Integrity Testing ........................................................................... 13 <br /> 3.7.5. Personnel, Training, and Discharge Prevention Procedures — ..................... <br /> 40 CFR 112.7(f)......................................................................................... 13 <br /> 3.8. SECURITY - 40 CFR 112.7(g) ......................................................................... 13 <br /> 3.9. TANK TRUCK UNLOADING RACK - 40 CFR 112.7(h) ................................... 14 <br /> 3.10. BRITTLE FRACTURE EVALUATION - 40 CFR 112.7(1) .............................. 14 <br /> 3.11. CONFORMANCE WITH STATE AND LOCAL APPLICABLE <br /> REQUIREMENTS - 40 CFR 112.70) ............................................................ 14 <br /> 4.0. DISCHARGE PREVENTION — SPCC PROVISIONS FOR THE FACILITY........ 14 <br /> 4.1. FACILITY DRAINAGE - 40 CFR 112.8(b)....................................................... 14 <br /> 4.2. BULK STORAGE CONTAINERS - 40 CFR 112.8(C) ...................................... 15 <br /> 4.2.1. Construction - 40 CFR 112.8 (c)(1) ........................................................... 15 <br /> 4.2.2. Secondary Containment - 40 CFR 112.8(c)(2) .......................................... 15 <br /> 4.2.3. Drainage of Berm Areas - 40 CFR 112.8(c)(3) .......................................... 15 <br /> 4.2.4. Corrosion Protection- 40 CFR 112.8(c)(4)................................................. 16 <br /> 4.2.5. Partially Buried and Bunkered Storage Tanks - 40 CFR 112.8(c)(5)......... 16 <br /> 4.2.6. Inspections and Tests - 40 CFR 112.8(c)(6).............................................. 16 <br /> 4.2.7. Heating Coils - 40 CFR 112.8(c)(7) ........................................................... 16 <br /> 4.2.8. Overfill Prevention Systems - 40 CFR 112.8(c)(8)..................................... 16 <br /> 4.2.9. Effluent Treatment Facilities - 40 CFR 112.8(c)(9) .................................... 17 <br /> 4.2.10. Visible Discharges - 40 CFR 112.8(c)(10).................................................. 17 <br /> 4.2.11. Mobile and Portable Containers - 40 CFR 112.8(c)(11) ............................. 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.