Laserfiche WebLink
AAFES WCDC Annual Tank Inspection Checklist <br /> Other Conditions <br /> Item Tank 1 Tank 2 TA 3 <br />/ Has the primary tank been checked and found to be free of water and other <br /> 20 contamination,or has another preventative measure been taken? es ❑No* ;des ONO* ❑Yes No* <br /> 21 Is the system free of any other conditions that need to be addressed for continuedes ONO* ❑N/A es ❑No* ❑N/A ❑Yes ONO* ❑N/A <br /> safe operation? <br /> Comments <br /> Item# Tank# Comment/Date Corrected <br /> a <br /> i <br /> 1 Testing for water should be done after each fuel delivery or annually,whichever is more frequent. An annual fuel quality test that meets <br /> ASTM standards is required by NFPA 110 8.3.8 for the fire pump fuel tank. <br /> Annual Checklist <br />