Laserfiche WebLink
CERS Consolidated Emergency Response / Contingency Plan <br />INTERNAL FACILITY EMERGENCY COMMUNICATIONS OR ALARM NOTIFICATION WILL OCCUR BY (Check all that apply): cu. <br />RADIO <br />0 1. VERBAL WARNINGS; • 2. PUBLIC ADDRESS OR INTERCOM SYSTEM; 0 3. TELEPHONE; <br />a 4. PAGERS; • 5. ALARM SYSTEM; • 6. FORTABLE <br />NOTIFICATIONS TO NEIGHBORING FACILITIES THAT MAY BE AFFECTED BY AN OFF-SITE RELEASE WILL OCCUR BY (Check all that apply): " 2 <br />RADIO <br />1. VERBAL WARNINGS; • 2. PUBLIC ADDRESS OR INTERCOM SYSTEM; • 3. TELEPHONE; <br />4. PAGERS; M 5. ALARM SYSTEM; • 6. PORTABLE <br />EMERGENCY COORDINATOR CONTACT INFORMATION: <br />PRIMARY EMERGENCY COORDINATOR NAME: Sarah Monge PHONE NO (209) 820-1815 <br />ALTERNATE EMERGENCY COORDINATOR NAME: Chelsea Silva PHONE NO.: (209) 820-1800 <br />CI3 <br />PHONE NO. (925) 812-3019 <br />PHONE NO.: (209) 777-0715 <br />NO.: III Check if additional Emergency Coordinator contact and address information is available onsite or by calling PHONE <br />Note: If more than one alternate emergency coordinator is designated, attach a list in order of responsibility. <br />D. EMERGENCY CONTAINMENT AND CLEANUP PROCEDURES <br />Check the applicable boxes to indicate your facility's procedures for containing spills and preventing and mitigating releases, fires and/or explosions. <br />DI <br />CLEANUP; <br />WASTEWATER AS HAZARDOUS WASTE; <br />ACTIONS; <br />02. <br />1. MONITOR FOR LEAKS, RUPTURES, PRESSURE BUILD-UP, ETC.; <br />2. PROVIDE STRUCTURAL PHYSICAL BARRIERS (e.g., Portable spill containment walls, built-in berms); <br />CI 3. PROVIDE ABSORBENT PHYSICAL BARRIERS (e.g., Pads, spill pigs, spill pillows); <br />III 4. COVER OR BLOCK FLOOR AND/OR STORM DRAINS; <br />M 5. LINED TRENCH DRAINS AND/OR SUMPS; <br />0 6. AUTOMATIC FIRE SUPPRESSION SYSTEM; <br />0 7. ELIMINATE SOURCES OF IGNITION FOR FLAMMABLE HAZARDS; <br />III 8. STOP PROCESSES AND/OR OPERATIONS; <br />9. AUTOMATIC / ELECTRONIC EQUIPMENT SHUT-OFF SYSTEM; <br />0 10. SHUT OFF WATER, GAS, ELECTRICAL UTILITIES; <br />0 11. CALL 9-1-1 FOR PUBLIC EMERGENCY RESPONDER ASSISTANCE AND/OR MEDICAL AID; <br />NOTIFY AND EVACUATE PERSONS IN ALL THREATENED AND/OR IMPACTED AREAS; <br />ACCOUNT FOR EVACUATED PERSONS IMMEDIATELY AFTER EVACUATION; <br />14. PROVIDE PROTECTIVE EQUIPMENT FOR ON-SITE EMERGENCY RESPONSE TEAM; <br />15. REMOVE CONTAINERS AND/OR ISOLATE AREAS; <br />0 16. HIRE LICENSED HAZARDOUS WASTE CONTRACTOR; <br />0 17. USE ABSORBENT MATERIAL FOR SPILL CONTAINMENT; <br />18. VACUUM SUCTION USING APPROPRIATE VACUUM (e.g., Intrinsically safe) FOR SPILL CONTROL AND/OR <br />19. DECONTAMINATE PERSONNEL AND EQUIPMENT WITHIN DESIGNATED AREA AND DISPOSE OF <br />20. PROVIDE SAFE TEMPORARY STORAGE OF HAZARDOUS WASTE GENERATED DURING EMERGENCY <br />21. OTHER (Specify): <br />E. FACILITY EVACUATION <br />THE FOLLOWING ALARM SIGN AL(S) WILL BE USED TO BEGIN EVACUATION OF THE FACILITY (Cheek all that apply): El <br />E2. I. BELLS; <br />MI 2. HORNS/SIRENS; <br />0 3. VERBAL (i.e., Shouting); <br />4. OTHER (Specify): <br />THE FOLLOWING LOCATION(S) WILL BE USED FOR AN EMERGENCY ASSEMBLY AREA(S) (e.g., Parking lot, street corner): E3. <br />In front of the dealership. <br />Note: The Emergency Coordinator must account for all onsite employees and visitors after evacuation. <br />EVACUATION ROUTE S AND ALTERNATE EVACUATION ROUTES ARE DESCRIBED AS FOLLOWS: t , <br />I <br />Plan. <br />III 1. WRITTEN PROCEDURES DESCRIBING ROUTES, EXITS, AND ASSEMBLY AREAS; <br />0 2. EVACUATION MAP(S) DEPICTING ROUTES, EXITS, AND ASSEMBLY AREAS; <br />3. OTHER (Specify): <br />Note: Evacuation procedures and/or maps should be posted in visible facility locations and must be included in the Contingency <br />F. ARRANGEMENTS FOR EMERGENCY SERVICES <br />ADVANCE ARRANGEMENTS FOR LOCAL EMERGENCY SERVICES (Check one of the following): 1 <br />I 2 <br />and/or emergency services <br />Contingency Plan. <br />0 1. HAVE BEEN DETERMINED NOT NECESSARY; <br />2. THE FOLLOWING ARRANGEMENTS HAVE BEEN MADE (Specify): <br />Note: Advance arrangements with local fire and police departments, hospitals, state and local emergency response teams, <br />contractors should be made for your facility, if necessary. Large Quantity Generators must describe arrangements in the <br />Rev. 03/07/17 Page 2 of 4