Laserfiche WebLink
APPLICATION- GRADING EXCAVATION <br /> SAN JOAQUIN COUNTY COMMUNITY DEVELOPMENT DEPARTMENT <br /> ::>::::>::::>::: ::>::: BUILDINGS AND;STRUGTURES <br /> t�:antarmatl ,�e::uhcwn !anie 5tscm> iaY ..... <br /> Structure Number• Proposed Use" Ground Floor Area Highest Floor Overall Height(in <br /> feo <br /> Not ApplicablE <br /> • The'structure number'should be used in identifying the structure on the Site Plan. <br /> •• If there are two or more proposed uses in a building, make separate listings for each use. For residential buildings, state <br /> the number of units in each structure. <br /> Qomrasita:3N5i(e <:s<........ ..:::::::::..::...:.: <br /> Public Water Service Provider Annex-Formation Distance to Public <br /> Proposed❑ Required Water (Feet) <br /> Existing 0 <br /> South San Joaquin Irrigation District No On-site <br /> Private Waterer Existing Well )U New Well ❑ Well Replacement ❑ <br /> :. <br /> :. .::• :: ::::::::::.::.................::::::::::.....:....:.........:.:............ <br /> ..........:...............:... .. .. <br /> .. .......................................................... ::: '..i>:::••>:G:•2`v:•::f.•N'i+.:+Yi{+.'+?:ii:Sik%:>:?tr:}+:$•'iv':r:%'•>:::i4:.i:'.O%•:ii:i is+v'r:... <br /> .....:. .:::.: <..:;:>.;:}:: :`:; t;; <br /> Public Sewage Service Provider Annex-Formation Distance to Public <br /> Disposal Required Sewer Facility <br /> Proposed❑ <br /> Existing Not Applicable <br /> [7%sfte Sewage Existing Septic System ❑ New Septic System ❑ Other 0 <br /> isposal O <br /> Storm Drainage <br /> Public Storm Service Provider (if Public) Annex-Formation Terminal Drainage Detention- <br /> Drainage Required to: Retention Ponds <br /> Proposed❑ <br /> Existing❑ <br /> Private Storm On-site Retention Pond(s) ❑ Natural Drainage/No Change ( Other ❑ <br /> Drainage <br /> $idsrting Fioeds <br /> Road/Street Name R.O.W.Width Pavement Width Curb/Gutter Sidewalks <br /> Austin Road Yes O No P( Yes❑ N9(q <br /> Yes❑ No O Yes 0 No O <br /> Yes❑ No 0 Yes O No❑ <br /> ''>EXrrBYaum 6"i'6*tltlYlflCs <br /> Excavation Area(Acres): 70.8 Fill Area (Acres): 9.2 <br /> Existing Site Elevation (Average at 100' Intervals): 49.11 <br /> Proposed Site Elevation (Average at 100' Intervals): 48.30 <br /> Perimeter Elevation (Average at 100' Intervals, 5'from Property Line): 48.91 <br /> Perimeter Elevation (Average at 100' Intervals, 100'from Property Line): 48.30 <br /> Amount of Material to be Removed (Cubic Yards): 84,127 CY <br /> Approximate Start Date: September 15, 1992 Approximate End Date: August 1 , 1994 <br /> Hours of Operation: 7 :00 a.m. - 7:00 p.m. —4Average Daily Truck Trips: 20 <br /> .3- <br /> E ' <br />