My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0013124
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
21930
>
2600 - Land Use Program
>
GX-92-9
>
SU0013124
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2020 1:18:43 PM
Creation date
4/13/2020 10:29:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0013124
PE
2600
FACILITY_NAME
GX-92-9
STREET_NUMBER
21930
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
RIPON
Zip
95366-
APN
24324008
ENTERED_DATE
3/30/2020 12:00:00 AM
SITE_LOCATION
21930 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONDITIONS OF APPROVAL <br /> SPRECKELS LAND COMPANY <br /> GX-92-9 <br /> Unless otherwise specified, all Conditions of Approval shall be <br /> complied with prior to commencement of grading and/or excavating. <br /> Those conditions followed by a Section Number or other Statutory <br /> Requirement are based on Ordinance Requirements. Ordinance <br /> Requirements cannot be modified. <br /> The Ordinance Requirements listed below have been identified as <br /> pertinent to this project. Ordinance Requirements cannot be <br /> modified. Other Ordinance Requirements may also apply. <br /> The approval will expire 18 months from the date of approval unless <br /> (1) all Conditions of Approval have been complied with and (2) all <br /> necessary permits from other agencies have been secured and remain <br /> in force. <br /> 1. DEVELOPMENT SERVICE DIVISION <br /> a. The average finished grade elevation shall be no lower than <br /> 48. 3 feet. (Planning Title Section 9-2224{bl {41) <br /> b. All Conditions of Approval shall be complied with and grading <br /> shall have commenced within eighteen (18) months of the date <br /> of approval of GX-92-9. Excavation and final rehabilitation <br /> of the site shall be completed within eighteen (18) months of <br /> the start of excavation. <br /> C. All private roads involved in the excavation shall be <br /> maintained so as to control the creation of dust. (Planning <br /> Title Section 9-2224{al) <br /> f. Provide certification of approval of proposed final grades <br /> from the South San Joaquin County Irrigation District prior <br /> to authorization being given to commence the grading <br /> excavation. (Planning Title Section 9-22241bl {21) <br /> g. Excavation operations shall not be carried on during the <br /> hours from nine (9) p.m. through five (5) a.m. , except during <br /> periods of declared national, state or local emergency. <br /> (Planning Title Section 9-2224{dl) <br /> h. All emissions shall be subject to the rules and regulations <br /> of the San Joaquin County Air Pollution Control District. <br /> (Planning Title Section 9-2224{fl) <br />
The URL can be used to link to this page
Your browser does not support the video tag.