My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SAN JOAQUIN
>
401
>
2900 - Site Mitigation Program
>
PR0505260
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2020 1:18:45 PM
Creation date
4/13/2020 1:06:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0505260
PE
2950
FACILITY_ID
FA0005154
FACILITY_NAME
FEDERAL BUILDING/US POST OFC
STREET_NUMBER
401
Direction
N
STREET_NAME
SAN JOAQUIN
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13915005
CURRENT_STATUS
01
SITE_LOCATION
401 N SAN JOAQUIN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
From:Darrll dela Torte To: Mary Meat's Date:8191,!85 Time:13:4259 Pape 1 of 1 <br /> 'Wao, skso <br /> ABIDE FAX COVER <br /> INTERNATIONAL <br /> INC. PAG <br /> To: Mary Meays rom : Darril dela Torre <br /> Company : San Joaquin Public Health Services ages : 1 <br /> Fax Number: -209-464-0138 Time : 13:42:12 For Information Call: (510)970-1497 <br /> Date : 8131195 Fax Number : (510)970-1120 <br /> Subject: Tentative re-start schedule Project : Stockton Fuel Tank <br /> We have been informed by Clemens Construction that their intent is to re-start construction on 915195. They will be <br /> removing the existing pea gravel as per your understanding with Cape Environmental and re-filling the hole with <br /> class II road base. Existing clean topsoil currently stockpiled on-site will cover the road base to a depth of <br /> approximately 3'-4'. Shoring will be removed and the site will be finished to grade level. The sidewalk and parking <br /> meters will be replaced. Clemens has anticipated that all the above work should be completed around 9122195. <br /> Should this tentative schedule change,we will inform your office. <br /> If you desire any additional information,please advise. <br /> Created using WinFax PRO 3.0 Delrina Technology Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.