Laserfiche WebLink
temperature of 40 Celsius for transport to the laboratory under Chain-of-Custody <br /> documentation. <br /> 2.4 PERMITTING <br /> Following Work Plan approval by the EHD and prior to initiation of field work, a drilling <br /> permit application will be submitted, permit fees paid, and permit issued by the EHD. <br /> 3.0 HEALTH AND SAFETY PLAN <br /> Prior to start of work, a site specific Health and Safety Plan (HSP) shall be prepared detailing j <br /> potential physical and chemical hazards, emergency response procedures, and other related topics. <br /> The HSP shall be kept on site during field activities and must be reviewed and signed by all field <br /> personnel. A health and safety meeting will take place each day prior to beginning work. <br /> 4.0 REPORT AND FINDINGS <br /> i <br /> Following completion of the work described in this work plan, a written report shall be prepared <br /> to describe field methods, techniques, observations, and include soil boring logs, scaled drawings, <br /> groundwater well construction information, and laboratory analyses. The report shall describe <br /> findings of the investigation and recommendations for further investigations, if deemed necessary. <br /> f_ This report will be designed to meet EHD reporting requirements. <br /> L <br /> i <br /> t <br /> F <br /> E <br /> C <br /> r i <br /> 2403c.20\stockton.pin 5 <br /> i <br />• II <br /> I <br />