Laserfiche WebLink
M. <br /> ACKIRMAN DRIB—+MW–20 <br /> SA-8 <br /> GROUNDWATER <br /> FLOW DIRECTION <br /> (Holz MW-11): A 6 <br /> Hol SA-1 Iz MW-3 S <br /> SA-5 <br /> SB-3 <br /> SB-4 <br /> SB-1 > <br /> SA-7 <br /> > <br /> > <br /> SA-2 1__UgSB-2 0 <br /> (Holz MW-2) <br /> 4 <br /> - .SA-4 SOUTH �;ACR <br /> (Holz MW-4) X ----�--'AMFfqT0 STREET <br /> < <br /> > <br /> STREET <br /> SCHOOL STREET <br /> URCHSTREET <br /> CHURCH STREET <br /> LEGEN 5A-1 PROPOSED SOIL BORINGS AND <br /> MW-1) Y N <br /> Holz Rubber Co. property line (Holz 'I' Existing monitoring well B-1 ® Soil boring MONITORING WELLS <br /> b - <br /> -Hj*I-M+H Railroad tracks MW-19+ Existing City of Lodi monitoring well SB-1 0 Proposed soil boring Lodi South Area <br /> Fence SA-5 + Proposed monitoring well 0 200 400 FEET Lodi, California <br /> SOURCE: Delta Environmental Consultants, Inc. site plan dated October 1997, and aerial photo of Lodi on September 2, 1999. Locations of offsite APPROXIMATE SCALE <br /> futures ore opproximote. 7AVC FIGURE <br />