My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SACRAMENTO
>
1129
>
2900 - Site Mitigation Program
>
PR0518901
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2020 1:33:04 PM
Creation date
4/13/2020 1:22:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0518901
PE
2960
FACILITY_ID
FA0014202
FACILITY_NAME
HOLZ RUBBER CO
STREET_NUMBER
1129
Direction
S
STREET_NAME
SACRAMENTO
STREET_TYPE
ST
City
LODI
Zip
95240
CURRENT_STATUS
01
SITE_LOCATION
1129 S SACRAMENTO ST
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Voice 209468-0337 Fax 209-468-3433 San Joaquin County <br /> Environmental Health <br /> Fax <br /> To: Eric Holm From: Mary Meays, Senior REHS "7✓� <br /> Fax: (916) 638-8385 Pages: 1 <br /> Re: 1129 South Sacramento Date: September 12, 1997 <br /> CC: Randall Hays (209) 333-6807 CC: Ed Marchese (209) 368-3246 <br /> ❑ Urgent ❑ For Review ❑ Please Comment ❑ Please Reply ❑ Please Recycle <br /> • Comments: <br /> Eric, <br /> I received on September 11, 1997, Delta's "Addendum to Revised Work Plan for On-Site <br /> Assessment"which proposed to drill and sample a soil boring, S131, in the area of MW4. The <br /> well which was installed in the area where SBI will be located was actually MW3. I also <br /> received telephone calls from Randall Hays and John Farr indicating that the City of Lodi had <br /> granted approval for SBI to be drilled and sampled in the proposed location. I also informed <br /> Randall Hays and John Farr of the numeric identification of the wells which were installed this <br /> week, based on PHS/EHD's information obtained in the field by Mike Berrington who is the <br /> field geologist representing Delta Environmental. <br /> Thank you for your efforts to keep me informed of the various schedule changes which have <br /> accompanied this week's field work. If I can provide any further information regarding <br /> permitting activities, please do not hesitate to contact me. <br />
The URL can be used to link to this page
Your browser does not support the video tag.