Laserfiche WebLink
aOA111Q OF TRUSTEES SAN J'PWAQUIN LOCAL HEALTH DISTRIC110" HAVING <br /> Junae Culbertson. Pres, <br /> Patricia E. vannucel. Sae'y. C11y of Lodi <br /> Anthonalla Van Spronaen 1601 East Hazellon Avenue, P. O. Box 20013 San Joaquin County <br /> Earl PlmantalCltyof Eacelon <br /> Stockton, California 95201 <br /> Fun lTupbea City of Manteca DanlN Cit L. Florae 209/466-6781 y of Ripon <br /> City of Stockton <br /> John D, Mart. M.D. Tracy <br /> Tra <br /> of ity Tra <br /> Wlllrarlt J. Wada Joel Khanna. M.D.. M.P.H.. Dlrlrlet meatlh Officer San Joaquin C411of County <br /> Mary Anna Low <br /> San Joaquin County <br /> Facility Name <br /> Address 2 IL <br /> Date of Inspection /- ,! <br /> p ,cJ�1, „ Inspector <br /> )WA <br /> MONITORING ALTERNATIVE #7 <br /> Limited to underground storage tanks which have infrequent inputs and withdrawals and <br /> where the liquid: level in the tank can be measured to an accuracy of +5 gallons or less <br /> when the tank is half full . <br /> This monitoring alternative shall include: <br /> 4,/Annual precision test on tank and piping. <br /> Tank gauging performed as follows: <br /> JTank must be capable of being secured to prevent unauthorized inputs and <br /> withdrawals. <br /> Tank must have no inputs or withdrawals for at least a 48 hour period <br /> (,2 days) at the end of consecutive periods lasting up to 7 days. <br /> (For example: tank in use Monday through Friday, then locked <br /> over weekend) . <br /> Liquid level measurements are taken at the beginning and end of the <br /> monitoring period (lasting at least 48 hours). <br /> (For example: level measured and recorded Friday night before <br /> locking and again on Monday morning before opening. ) <br /> If liquid level varies more than 1% of the tank volume or 5 gallons, which <br /> ever is less, between measurements, an unauthorized release shall be <br /> assumed to have occurred and shall be reported to the local agency within <br /> 24 hours, as per Article 5, Sect. 2652 of the regulations and further <br /> evaluations shall be performed to verify or disprove the variations. <br /> Implementation of the monitoring alternative requires that the following circled items be <br /> completed by the dates specified. <br /> l .• Precision test(s) must be performed by(a 9 7 and results submitted to this <br /> office within 30 days of the test. <br /> !/ 2. Tank Jauging must be started immediately. (See instructions above). <br /> � If the above compliance dates cannot be met, contact this office prior to the specified <br /> date. <br /> 4/86 UGT 3 <br />