My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0006937
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
5606
>
2900 - Site Mitigation Program
>
PR0541401
>
ARCHIVED REPORTS_XR0006937
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2020 2:09:26 PM
Creation date
4/13/2020 4:00:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0006937
RECORD_ID
PR0541401
PE
2950
FACILITY_ID
FA0006046
FACILITY_NAME
UNION OIL STATION #5098
STREET_NUMBER
5606
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
02
SITE_LOCATION
5606 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GENERAL PROVISIONS <br /> I VALIDATION — This permit is not valid unless signed by the Public Works Directo*or his authorized representative <br /> REVOCATION — This permit is non-transferable and is void if work is not completed prior to expiration date An extension may be granted <br /> rif such extension is requested forty-eight hours before the permit expires <br /> CCEPTANCE OF PROVISIONS -- It is understood and agreed by the permittee that the doing of any work under the permit shall constitute <br /> an acceptance of the provisions <br /> 4 KEEP PERMIT ON JOBSITE — The permit and control number shall be kept on the jobsite and shall be shown to any representative of the <br /> City requesting verification of permit issuance <br /> INSPECTION AND APPROVAL. — A minimum of (24) twenty-four hours notice shall be required prior to placing any backfill, connection <br /> to any existing facility or the placement of any concrete or paving work Inspection shall not be deemed a waiver on the part of the City of <br /> the right to demand correction of defects discovered at a subsequent date <br /> STANDARD SPECIFICATIONS — All work shall conform to the City of Stockton standard specifications <br /> MINIMUM INTERFERENCE,WITH AND PROTECTION OF TRAFFJC-=All work shall be-planned and carried out so there will be the least <br /> possible Inconvenience to the traveling public Placing of lights, barricades,warning signs and other safety devices required for public safety <br /> shall be the responsibility of the permittee All'safety provisions and devices shall conform-to the requirements of Chapter 5 of the State of <br /> California Traffic Manual / <br /> 8 FAILURE TO COMPLY WITH GENERAL PROVISIONS — The permittee agrees to reimburse the City for performing all work and furnishing <br /> all material to correct any failure to comply with these provisions as well as all applicable City ordinances and standards and specifications <br /> currently in effect <br /> * _ r <br /> 9 NOTIFICATION OF UTILITY COMPANY — The permittee shall notity utility companies 48 hours prior to beginning any construction which <br /> may involve underground or overhead facilities and will pay all expenses for any removal or relocation necessary Valves on water mains may <br /> not be turned off without permission of the utility company involved <br /> 10 NOTIFICATION OF POLICE, FIRE AND PUBLIC WORKS DEPARTMENTS --- When streets are to be blocked, the Police. Fire and Public <br /> Works Departments are to be notified each day the street is to be blocked and/or when traffic is delayed or hindered Access to fire hydrants <br /> shall be maintained at all times Streets will not be closed without prior approval of City Traffic Engineer and Permit Engineer <br /> CLEANUP OF JOBSITE — The permittee will remove any refuse material from the lobsite within three days after completion of the work <br /> DELINQUENT BILLS — Failure to pay any delinquent bill accrued under any previous permit issued by the Department of Public Works will <br /> e cause for rendering the applicant ineligible for any other permit from the Department of Public Works until such bill is paid <br /> WbEETING <br /> EXISTING IMPROVEMENT — The permittee shall be responsible for meeting all adjacent frontage improvements such as paving ` <br /> and sidewalks <br />�1 THE PERMITTEE <br /> To provide a more efficient and economical inspection service for Encroachment Permit construction,we are asking that the following procedure <br /> be followed by all permittees <br /> 1 Notify the Permit Engineer,(209)937-8411,and obtain a control number at feast twenty four(24)hours prior to the start of work <br /> 2 Discuss with the Permit Engineer or inspector any unusual'or difficult features of the construction <br /> 3 Advise Permit Engrneer of name and phone number of contact person for the project prior to beginning work <br /> 4 Notify the Permit Engineer one day In advance to cancel a scheduled inspection or to request an additional or earlier inspection <br /> 5 Notify the Permit Engineer upon completion of construction (209)937-8411 <br /> INSPECTION SCHEDULE <br /> Listed below are several types of construction and points at which Inspection must be made prior to continuing construction operation Unauthorized <br />�tinuance of construction beyond an inspection point may result in rejection of all work <br /> CONCRETE PIPE LAYING <br /> 1 Grade and excavation before forming 1 Excavation and bedding <br /> 2 Forms before placement of concrete 2 Pipe laying <br /> 3 Cleanup and final approval 3 Backfill(compaction test may be required) <br /> I ` 4 Final approval <br /> r� <br /> F Q <br /> v <br />
The URL can be used to link to this page
Your browser does not support the video tag.