EI��® <br /> Mr James L Barton <br /> October 29, 2004 <br /> Page 3 <br /> included in Attachment E Third quarter 2004 analytical results for TPHg benzene and methyl <br /> tertiary butyl ether (MtBE) are summarized on the respective cross-sections <br /> Remediation System Description <br /> The remediation system consists of an Air Sparge / Soil Vapor Extraction (AS/SVE) system <br /> The AS system includes an air compressor with a maximum positive displacement of 95 <br /> standard cubic feet per minute (scfm) at 125 pounds per square inch (psi) that is manifold to ten <br />' air sparge points and air sparge well AS-26 The system infects contaminant-free air into the <br /> subsurface saturated zone at rates between approximately 10 0 and 58 0 scfm, enabling a <br /> phase transfer of hydrocarbons from a dissolved state to a vapor phase The air is then vented <br /> tthrough the unsaturated (vadose) zone <br /> The sparge wells are manifold to the system by Schedule 40 polyvinyl chloride (PVC) The flow <br />' rate for each sparge well can be manually adjusted to optimize the system Additionally, each <br /> sparge well is equipped with ports that allow for the monitoring of air flow rates and pressure <br /> The SVE system includes a thermal oxidizer with a 1,000,000 British Thermal Units (BTU) <br /> burner and a positive displacement vacuum compressor rated at 400 scfm The approximate <br /> operating vacuum is 80 inches of H2O A vacuum is applied through thirteen soil vapor <br /> extraction wells, and four groundwater monitoring wells near the previously identified sources of <br /> contamination in the vadose zone soil Extracted vapor is treated using the thermal oxidizer <br /> before being released to the atmosphere The system is operated under San Joaquin Valley Air <br />' Pollution Control District (SJVAPCD) Permit Number N-5879-1-0 <br /> SVE wells are manifold to the system by Schedule 40 PVC piping The flow rate for each <br /> extraction well can be manually adjusted to optimize the system Additionally, each extraction <br /> well is equipped with ports that allow for the monitoring of air flow rates and or pressure Well <br /> construction details are in Attachment C and the system layout is shown in Figure 14 <br />' Soil Vapor Extraction System Status <br /> The SVE system was started in October 1999 as required by CAO No 5-00-707 The SVE <br /> t <br /> system was shut down in October 2003, based on RWQCB approval, as stated in their letter <br /> dated October 23, 2004 The SVE system was restarted on September 24, 2004, based on <br /> RWQCB approval, as stated in their letter dated September 10, 2004 <br /> L ,r- _ ..*__ .n nr4^Kgr 1 QQQ the RVE system has operated for a total of <br /> Mt Since starting the O V F_ -JYDLVI I 1 I.. <br /> ,.. - - - - -- <br /> 6,412 hours and has removed approximately 8,463 pounds of petroleum hydrocarbons from <br />' impacted soil and groundwater <br /> A summary of SVE system operational parameters, destruction efficiencies, and mass flow <br /> rates are presented in Table 4 through Table 9, respectively <br /> 1OcsacramentolprojectsTrojects10694OW96-2937inaRReports\Quartedy Mondonng ReportO098 3rd Qtr 04-QMR doc <br /> Cc-Job, inn 31` Yearrof_x�pjfa C n CnVIY(n/ Yii2 SPrvC�e <br />