My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0007034
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
5606
>
2900 - Site Mitigation Program
>
PR0541401
>
ARCHIVED REPORTS_XR0007034
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2020 2:18:18 PM
Creation date
4/13/2020 4:22:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0007034
RECORD_ID
PR0541401
PE
2950
FACILITY_ID
FA0006046
FACILITY_NAME
UNION OIL STATION #5098
STREET_NUMBER
5606
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
02
SITE_LOCATION
5606 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M Mir M M M M M 113111111111111 r M M M � � � <br /> Table 3 <br /> Air Sparge and Vapor Extraction Well <br /> Flow Rate and Pressure <br /> Former Unocal Service Station No 5098 <br /> 5606 Pacific Avenue <br /> Stockton, California <br /> Well ID Date Time Pressure Flow Rate Field Observations <br /> (inches H2O) (scfm) <br /> AS-12 07/22/04 740 26296 6 <br /> VEW-9AIB 07/22/04 900 085 NM <br /> AS-9 07/22/04 924 26296 13 <br /> VEW-13AIB 07/22/04 945 1 35 NM <br /> AS-13 07/22/04 1000 24912 45 <br /> VEW-3 07/22/04 1025 090 NM AS-3 Connected to VEW-3, valve is closed (well not operating), may need new pipe <br /> AS-3 07/22/04 1025 NM NM (observed tape being used to contain leaks on existing pipe), took picture <br /> VEW-4A1B 07/22/04 1040 068 NM AS-4 Similar to AS-3/VEW-3 valve closed, old/taped pipe, may require new AS pipe, AS <br /> AS-4 07/22/04 1040 NM NM conveyance pipe cannot be modified in its current condition, took picture <br /> VEW-5 07/22/04 1055 250 NM <br /> AS-5 07/22/04 1115 24912 630 <br /> VEW-8 07/22/04 1315 4750 NM <br /> AS-8 07/22/04 1333 30448 125 <br /> VEW-11A 07/22/04 1449 085 NM <br /> AS-11 07/22/04 1505 27680 55 <br /> VEW-10 07/22/04 1535 050 NM AS-10 Unable to modify sparge line with flow measuring port because existing valve not <br /> AS-10 07/22/04 1535 27680 NM restricting air flow when in closed position Modification will require two person field event <br /> VEW-7 07/22/04 1535 NM NM AS-7 Unable to modify during site visit due to inability to control mall traffic Will require two- <br /> AS-7 07/22/04 1535 NM NM person field event to modify AS conveyance pipe <br /> EXPLANATIONS <br /> NM = Not measured <br /> scfm = Standard Cubic Feet per Minute <br /> Inches H2O = Inches of water <br /> System puts out 553 6 Inches H2O <br /> 06940-293 1 of 1 ENSR Corporation <br />
The URL can be used to link to this page
Your browser does not support the video tag.