My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MADRUGA
>
1250
>
2800 - Aboveground Petroleum Storage Program
>
PR0515716
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2020 2:48:42 PM
Creation date
4/14/2020 10:52:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0515716
PE
2832
FACILITY_ID
FA0009618
FACILITY_NAME
FOOD EXPRESS INC
STREET_NUMBER
1250
Direction
E
STREET_NAME
MADRUGA
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
24141028
CURRENT_STATUS
01
SITE_LOCATION
1250 E MADRUGA RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
268
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Food Express, Inc. - Lathrop , CA <br /> Appendix B & C Tank, Piping & Secondary Containment <br /> e Inspection Checklists 2012 <br /> Tank, Piping & Foundation y F°�`m` <br /> Inspection <br /> Check fuel oil product tanks, piping and Checklist Instructions: <br /> foundation for leaks: (as appropriate) Place an "X" in the box associated with <br /> Product droplets or drip marks the observed defect as appropriate for <br /> Discolorization of tanks, piping&filter � the facility. If no defects are observed, <br /> place a ,mark in each of the boxes for <br /> Puddles containing oil products or sheen the month. If defects are observed and <br /> Corrosion V V marked, a plan for corrective action <br /> Localized dead or damage ve atation V ✓ must be prepared and implemented.on <br /> Vent caps are in place U page 2 of Appendix B & C or additional <br /> Tank supports V v L sheets as needed. <br /> Cracks or fissures VO.V L' Note: <br /> Settling ( All inspections must be performed on a <br /> Gaps between tank&foundation U monthly basis. The responsible person <br /> Evidence of seeping values or seals ` U for performing the inspection shall initial <br /> and date each month that they <br /> Emergency control valves V inspected the facility. Again it is <br /> L�General Area Inspection imperative that the person doing the <br /> Inspection of area for oil and solid waste spills inspection make note of any <br /> Excessive level of precipitation <br /> ` discrepancies in any of the <br /> abovementioned items and report them <br /> Debris immediately to the proper facility <br /> Corrosion V , personnel. Similar requirements exist in <br /> Leaks V 40 CFR 112.7(e). <br /> Oil product stains ors ills 711. <br /> Hazardous waste drums labled < 180 days <br /> No unsecured hazadous waste v Special Instructions: <br /> Waste removal and manifests on site Inspection Oil/Water Separators: <br /> Containment inspection J Inspect monthlyy each iteam and <br /> check the appropriate box. <br /> Other V If oil product present, then have <br /> removed as Hazardous Waste under <br /> Inspection performed by: cz� N manifest by a CA Registered <br /> Please sign and date legibly > Transporter. if Oil Sheen present, use <br /> absorbent pads to remove sheen then <br /> drain clean water into Drainage <br /> System. Place used pads in labeled <br /> Hazardous Waste Container. Report <br /> any spills. <br /> Note: Document any action taken in <br /> Appendix D - Secondary Drainage <br /> Report. <br /> Environmental Services <br /> 2012 36 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.