My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PORT
>
2323
>
2800 - Aboveground Petroleum Storage Program
>
PR0528393
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2020 10:35:25 AM
Creation date
4/14/2020 11:22:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0528393
PE
2832
FACILITY_ID
FA0009156
FACILITY_NAME
CALAMCO
STREET_NUMBER
2323
Direction
W
STREET_NAME
PORT
STREET_TYPE
RD
City
STOCKTON
Zip
95203
APN
14503001
CURRENT_STATUS
01
SITE_LOCATION
2323 W PORT RD G
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tanknology Inc. <br /> 11000 N.MoPac Expressway, Suite 500 Austin,TX 78759(800)964-0010 Policy 100-29-B <br /> INSPECTOR ONLY Rev:A <br /> SAFETY CHECKLIST - OVF <br /> Site Name/#: Street Address: City,State,and Zipcode: W.O.# <br /> CALAMCO CALAMCO PO Box 7275 Stockton,CA 95267 AST-6704338 <br /> Arrival Time: Departure Time: Travel Time: Others on site: Date: <br /> 9:40:00 AM MST 112:53:00 PM MST Jan 20,2020 <br /> Scope of Work and Tasks Performed(JSA's must be available for all tasks): <br /> AST Inspection <br /> Repairs to Equipment or Parts Provided: <br /> Follow-up actions required;equipment isolated;comments: <br /> PPE-PERSONAL PROTECTIVE EQUIPMENT REQUIRED(Check items used or mark—if not applicable) <br /> 0 Safety Vest 0 Safety Glasses 0 Gloves ❑ Hearing Protection <br /> 0 Steel Toe Boots ❑ Splash Goggles 0 Hard Hat ❑ Other <br /> PRE-TEST PROCEDURES (Check each item completed or mark- if not applicable) <br /> 1. 0 Discuss safety procedures with site personnel.Nearest hospital: <br /> 2. ❑ Prior to fuel deliveries the UST system must be placed back into working order. <br /> 3. ❑ Secure entire work area with barricades(cones,flags,and caution tape,pennant flags,or other perimeter guard). <br /> 4. ❑ Place fire extinguishers and"No Smoking"signs in the work area. <br /> SIGN IN Lead Technician Name Lead Technician Signature <br /> General Safety Checks: <br /> 0 All site personnel have been informed. Philip Thiel <br /> ❑ Fuel delivery has been informed. <br /> ❑ Work areas barricaded to protect workers,staff&public. Site Representative Name Site Representative Signature <br /> ❑ Is a fuel delivery due today? <br /> 90 <br /> I have discussed job clearance form with technician. <br /> POST-TEST PROCEDURES (Check each item completed or mark- if not applicable) <br /> 1. ❑ Run all pumps and verify there are no leaks: <br /> ❑ Impact Valve Test Ports under dispensers ❑Leak Detector Threads on STP's ❑ Functional Elements&Relief Screws <br /> 2. Z Confirm location was returned to pre-arrival state <br /> 3. ❑ Remove barricades <br /> SIGN OUT&Operator Verification of Work(OVF) Lead Technician Name Lead Technician Signature <br /> General Safety Checks: <br /> ❑X Work area has been left tidy&safe Philip Thiel <br /> ❑ Site staff are aware of work status including any remaining isolation <br /> Site Representative Name Site Representative Signature <br /> ❑ Changes to equipment are documented and communicated <br /> ❑ All incidents,near incidents,and unsafe situations reported <br /> Site Representative Comments: <br />
The URL can be used to link to this page
Your browser does not support the video tag.