My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CALLOWAY
>
4145
>
2800 - Aboveground Petroleum Storage Program
>
PR0514480
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2020 1:28:18 PM
Creation date
4/14/2020 11:42:33 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0514480
PE
2221
FACILITY_ID
FA0010980
FACILITY_NAME
G&L BROCK CONSTRUCTION CO INC
STREET_NUMBER
4145
STREET_NAME
CALLOWAY
STREET_TYPE
CIR
City
STOCKTON
Zip
95215-2420
APN
08722004
CURRENT_STATUS
01
SITE_LOCATION
4145 CALLOWAY CIR
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN JOAQUIN COUNTY <br /> ENVIRONMENTAL HEALTH DEPARTMENT <br /> 600 East Main Street, Stockton, CA 95202-3029 <br /> Telephone:(209)468-3420 Fax:(209)468-3433 Web:www.sigov.org/ehd <br /> RETURN TO COMPLIANCE CERTIFICATION <br /> Any MINOR violations noted in the"Notice to Comply" in the attached Inspection Report must be <br /> corrected within 30 days of receipt of this inspection. This certification form must be submitted to the <br /> Environmental Health Department(EHD) address at the top of this form within 30 days of receipt of the <br /> Inspection Report. <br /> All corrections to other violations noted in the attached Inspection Report (IR) or Continuation Form, or <br /> disputes to any violations, are to be submitted using this certification and returned to EHD within 30 days <br /> unless otherwise specified in the Inspection Report. <br /> Note: All EHD staff time associated with failing to comply by the above noted dates will be <br /> billed at the current hourly rate. <br /> For this Certification t0 be complete the operator of the site must include: <br /> • A statement documenting what corrective actions were taken or will be taken for each violation <br /> • Copies of sample results/manifests/training records/other appropriate paperwork, and/or photos <br /> verifying corrections <br /> • Operator's certification <br /> Inspection Date: /�!iCIUS} 20, 1,210Inspected By: Ga f f e t Pr(C Ku=� <br /> Facility Address: y1Ll5 CALIA0VVA� C T . EPA ID#: <br /> STO C 1KT(--)0 - C --\ g 5 Z IS <br /> 1 certify under penalty of law that: <br /> 1. 1 have corrected the violations specified in the Inspection Report from the above-mentioned <br /> inspection date. <br /> 2. 1 have personally examined the following documentation submitted as proof of compliance FOR <br /> EACH VIOLATION and I believe the information to be true, accurate, and complete: <br /> Photos Paperwork Statement <br /> 3. 1 am authorized to submit this certification on behalf of the Respondent. <br /> 4. 1 am aware that there are significant penalties for submitting false information, including the <br /> possibility of a fine and/or imprisonment for known violations. (HSC 25191) <br /> Name: L I S Cj C CU S Sin Title: Df tI C e 1'YICI.n c(C e <br /> Signature: �._ i lJ , J Date: <br /> i . J rt: <br /> EHD 22-02-005 Rev 10109 <br />
The URL can be used to link to this page
Your browser does not support the video tag.