Laserfiche WebLink
GENERAL CONSIDERATIONS: <br /> 1. Does it appear that any environmental feature of the project <br /> will generate significant public concern or controversy? <br /> ( ) Yes 0() No Nature of concern(s) : <br /> 2 . Will the project require approval or permits by agencies other <br /> than the County? ( ) Yes (x) No <br /> Agency name(s) : <br /> 3 . Is the project within the Sphere of Influence, or within two <br /> miles, of any city? <br /> (x) Yes ( ) No City: rctJ l�( <br /> to fie. C <br /> on bei- ( , l4 2 , ted. .7 o� <br /> ENVIRONMENTAL IMPACTS: Oc4o6py (q1 M9, M Y bh, !F_cWd <br /> "Yes" may only be checked in situations where there is substantial evidence to <br /> indicate that there may be a significant adverse impact on the environment if <br /> there is no change in the project description. (CEQA Guidelines, Sec. 15064) <br /> See the "Discussion" section at the end of the Initial Study for explanation of <br /> any impacts checked "Yes", or any "No" answer marked with an asterisk (*) . <br /> Sources. The following sources of information have been used in determining <br /> environmental impacts: <br /> original source materials and maps on file in the Community Development <br /> Department including: all County and city general plans and community plane; <br /> assessor parcel books; various local and FEMA flood zone maps; service district <br /> maps; maps of geologic instability; maps and reports on endangered species such <br /> as the Natural Diversity Data Base; noise contour maps; specific roadway plans; <br /> maps and/or records of archeological/historic resources; soil reports and maps; <br /> etc. Many of these original source materials have been collected from other <br /> public agencies or from previously prepared EIR's and other technical studies. <br /> Additional standard sources which should be specifically cited below include <br /> on-site visits by staff (note date); staff knowledge or experience; and <br /> independent environmental studies submitted to the County as part of the project <br /> application (note report title, date, and consultant) . <br /> YES N <br /> 1. WATER: <br /> a. Is any portion of the project <br /> subject to flood hazard? X <br /> Flood zone it G it <br /> Initial Study (Rev: 01/9 ) <br /> -12- <br />