Updated Site Conceptual Model and Second Quarter 2002 Monitoring and Remediation Report <br /> Cleanup and Abatement Order No 5-00-707 <br /> EAI Project No 1232 <br /> • 4 0 REMEDIATION SYSTEM STATUS REPORT <br /> 4.1 Remediation Compound Relocation <br /> Due to construction work at the Wardssite by Stone Brothers, the remediation compound was <br /> relocated approximately 300 feet east of its former location The remediation system was <br /> restarted on April 21, 2002 <br /> 4.2 Remediation Results <br /> During the Second Quarter 2002, the oxidizer was operated for approximately 446 hours while <br /> the air sparging compressor was operated for 735 hours The vapor extraction system removed <br /> only 38 pounds of hydrocarbons (see Tables 5 and 6) Due to low concentration of VOCs in <br /> the extracted soil vapor, the remediation system was operated in a "pulsed" air sparging mode <br /> (three days "on" and four days "off") the last half of the quarter <br /> On April 21, 2002, VOC readings were obtained from vapor extraction wells using a PID All <br /> readings were insignificant, i e , at or just slightly above the background level with the <br /> exception of wells VEW-2, VEW-13, and MW-I9S which had PID readings in excess of 1000 <br /> ppmv Well VEW-2 had the highest PID reading of all wells Analytical testing of soil vapor <br /> obtained from VEW-2 contained TPH at a concentration of 239 ppmv, total xylenes 2 9 ppmv, <br /> MTBE of 0 6 ppmv (by EPA Method 8021 B) Benzene and toluene were below the detection <br /> limit of 0 1 ppmv Note during this sampling event, an excessive amount of water vapor was <br /> observed in the air stream from well MW-25S although no sparging was being performed in <br /> well MW-25D <br /> On April 21, 2002, analytical testing of soil vapor at the inlet of the <br /> p oxidizer indicated a TPH <br /> concentration of 49 ppmv (see Appendix C) or 158 µg/L, total xylenes of 1 5 ppmv, MTBE of <br /> 0 1 ppmv (by EPA Method 8021B) Benzene and toluene concentrations were below the <br /> detection limit of 0 1 ppmv <br />' As required by conditions of the air quality permit quarterly sampling was performed on Tune <br /> 17, 2002 Only 0 21 ppmv of total xylenes were detected in the soil vapor sample taken at the <br /> inlet of the oxidizer No other chemicals were detected <br /> Since starting the remedial system, the thermal oxidizer has operated for a total of 5,706 hours <br /> and the sparging compressor for 6,746 hours, removing approximately 8,453 pounds of <br /> petroleum hydrocarbons from impacted soil and izround water (see Table 6) ThP arnn„nt of <br /> biodegraded hydrocarbons is not included in this total and is difficult to calculate V M Yy <br /> Since restarting the remediation system in Tune 2001, the thermal oxidizer has operated for <br /> 1,048 hours and the sparging compressor for 2,810 hours, removing total of 93 pounds of <br /> petroleum hydrocarbons from the subsurface by vapor extraction (see Table 6) <br /> IIHM 1232RO231 -6- <br />' ENVIRONMENTALAUDIT, INC QP <br />