Laserfiche WebLink
' Updated Site Conceptual Model and Second Quarter 2002 Monitoring and Remediation Report <br /> Cleanup and Abatement Order No 5-00-707 EAI Project No 1232 <br /> TABLE OF CONTENTS <br /> TABLES <br /> ' I GROUND WATER ANALYTICAL TESTING RESULTS <br /> 2 WELL CONSTRUCTION DETAILS <br /> 3 GROUND WATER ELEVATIONS <br /> ' 4 GROUND WATER TESTING RESULTS - JUNE 2002 <br /> 5 OPERATING PARAMETERS <br /> 6 TPH REMOVAL AND DESTRUCTION EFFICIENCY <br /> 1 FIGURES <br /> 1 LOCATION MAP <br /> ' 2 SITE PLAN <br /> 3 WELL CONSTRUCTION DETAILS <br /> 4 TREND ANALYSIS -MW-2 <br /> 5 TREND ANALYSIS -MW-3 <br /> 6 TREND ANALYSIS -MW-11 <br /> 7 TREND ANALYSIS -MW-12 <br /> 8 UNIT A GROUND WATER ELEVATION MAP <br /> 9 UNIT B GROUND WATER ELEVATION MAP <br /> 10 UNIT A TPH-G ISOCONCENTRATION MAP <br /> 1 I UNIT B TPH-G ISOCONCENTRATION MAP <br /> 12 UNIT A BENZENE ISOCONCENTRATION MAP <br /> 13 UNIT B BENZENE ISOCONCENTRATION MAP <br />' 14 ANALYTICAL TESTING RESULTS <br /> APPENDICES <br />' A GETTLER-RYAN STANDARD OPERATING PROCEDURES FOR GROUND <br /> WATER MONITORING <br /> B GETTLER-RYAN FIELD LOGS <br /> C CHAIN OF CUSTODY RECORDS AND LABORATORY REPORTS <br /> r <br />' RHM 1232RO231 -11- <br /> ENIVIRONMENTAL AUDIT, INC <br /> 1 <br />