Laserfiche WebLink
' Updated Site Conceptual Model and First Quarter 2002 Morutor>ng and Remediation Report <br /> Cleanup and Abatement Order No 5-00-707 EAI Project No 1232 <br /> TABLE OF CONTENTS <br />' TABLES <br /> I GROUND WATER ANALYTICAL TESTING RESULTS <br />' 2 SUMMARY OF SOIL TESTING RESULTS - WARDS SITE PRIOR TO 2001 <br /> 3 SUMMARY OF SOIL TESTING RESULTS - UNOCAL SITE PRIOR TO 2001 <br /> 4 SUMMARY OF SOIL TESTING RESULTS 2001 <br /> 5 WELL CONSTRUCTION DETAILS <br /> 6 GROUND WATER ELEVATIONS <br /> 7 GROUND WATER TESTING RESULTS - MARCH 2002 <br /> ' 8 TPH REMOVAL AND DESTRUCTION EFFICIENCY <br /> 9 VOC READINGS BY FIELD INSTRUMENT <br /> 10 OPERATING PARAMETERS <br /> FIGURES <br /> 1 LOCATION MAP <br /> ' 2 SITE PLAN <br /> 3 TPH-G AND BENZENE CONCENTRATIONS IN SOIL <br /> 4 WELL CONSTRUCTION DETAILS <br /> ' 5 CROSS SECTION A-A' <br /> 6 CROSS SECTION B-B' <br /> 7 TREND ANALYSIS — MW-2 <br /> 8 TREND ANALYSIS — MW-3 <br /> 9 TREND ANALYSIS —MW-11 <br /> 10 TREND ANALYSIS — MW-12 <br /> ' 11 UNIT A GROUND WATER ELEVATION MAP <br /> 12 UNIT B GROUND WATER ELEVATION MAP <br /> 13 UNIT A TPH-G ISOCONCENTRATION MAP <br /> i14 UNIT B TPH-G ISOCONCENTRATION MAP <br /> 15 UNIT A BENZENE ISOCONCENTRATION MAP <br /> 16 UNIT B BENZENE ISOCONCENTRATION MAP <br /> ' 17 ANALYTICAL TESTING RESULTS <br /> APPENDICES <br /> A BORING LOGS AND WELL CONSTRUCTION DETAILS <br /> FOR WELLS INSTALLED IN 2001 <br /> B GETTLER-RYAN STANDARD OPERATING PROCEDURES FOR GROUND <br /> WATER MONITORING <br /> C GETTLER-RYAN FIELD LOGS <br /> ' D CHAIN OF CUSTODY RECORDS AND LABORATORY REPORTS <br /> E PERMITS <br /> i <br /> BHM 1232RO241 -11- <br /> ENVIRONMENTAL AUDIT, INC QD <br /> r <br />