Laserfiche WebLink
Updated Site Conceptual Model and Second Quarter 2003 Monitoring and Remediation Report <br /> Cleanu and Abatement Order No 5-00-707 EAl Pro ect No I232 <br /> In May 2002, the RTW was replaced The new Delta College irrigation well became <br /> Operational in July 2002 <br /> 1 15 Cleanup and Abatement Order <br /> On September 8, 2000, the RWQCB issued CAO No 5-00-707 The CAO requested the <br /> responsible parties investigate and clean up petroleum hydrocarbons from the former UST <br /> systems located on the Wards and Unocal sites, and stated that discharges from these two <br /> properties have impacted ground water extracted and used by San Joaquin Delta College to <br /> imgate its campus This report has been prepared in accordance with the quarterly reporting <br /> requirements outlined in the CAO As required by the CAO, this quarterly report includes the <br /> following <br />' • Ground water analysis results for total petroleum hydrocarbons as gasoline (TPH-G) by <br /> modified EPA Method 8015, and volatile organic compounds (VOCs), including fuel <br /> oxygenates, e g , MTBE, TBA, DIPE, ETBE, TAME, and EDB by EPA Method 8260B <br /> • Ground water elevation contour maps <br /> • Hydrographs for representative monitoring wells <br /> e Pollutant concentration contour maps for TPH-G and benzene <br /> • Tabular listing of all monitoring well details <br /> • Tabular results of current sampling data completed during the current quarter <br /> • Tabular results of all previous data collected including current sampling data <br /> • Ground water purge data sheets <br /> 0 Narrative describing the work presented in the report, including methodology, <br /> conclusions, and recommendations <br /> • Schedule outlining future activities <br /> • Data documenting disposal of investigation derived wastes <br /> 1 <br />' sHM WORD 1232RO351 -3- ENVIRONMENTAL AUDIT, INC p <br />