Laserfiche WebLink
I - PROPOSED MONITORING WELL CONSTRUCTION <br /> DETAILS FOR MW-31 AND MW-32 <br /> DEPTH FROM G S (FEET) <br /> LOCKING CAP FLUSH MOUNTED STEEL TOP OF STEEL BOX FLUSH MOUNT <br /> TRAFFIC RATED WELL BOX <br /> GROUND SURFACE <br /> GROUND SURFACE $ <br /> TOP OF CASING ^0 5 BGS <br /> BLANK SCH 40 PVC TOP OF CEMENT GROUT SEAL 1 BGS <br /> PORTLAND CEMENT AND X5% <br /> BENTONITE POWDER <br /> —_ MW-31 MW-32 <br /> TOP OF BENTONITE CHIPS 81 94 <br /> TOP OF#3 SAND 84' 97 <br /> — #3 LONESTAR SAND TOP OF SCREEN 85 98 <br /> BENTONITE CHIPS <br /> #3 LONESTAR SAND BOTTOM OF SCREEN 90 703 <br /> _ 2-(#20 SLOT)SCH 40 PVC <br /> — BASE OF#3 SAND 90 103 <br /> BOREHOLE DIAMETER APPROXIMATELY 8' <br /> BOTTOM OF BOREHOLE 90' 103 <br /> NOT TO SCALE <br /> PROPOSED WELL CONSTRUCTION DETAILS FIGURE <br /> � �o _ - -- ---- ---SINGL-E-COMPLETION - - - - --- - <br /> ` Fortner UNOCAL Station 5098 Monitoring Wells 3 <br /> 10411 Old PlacenAlle Road Ste 210 5400 and 5606 Pacific Avenue MW-31 AND MW-32 <br /> Sacramento California 95827 Stockton,California <br /> Phone (916)362 7100 PRAWN BY DA PROJECT NUMBER <br /> Fax (916)362.8100 <br /> Web WWW ENSRCOM D PARTIDA 11/02/2004 06940-293 <br /> J IProlect510694015098-2931CAD14Q0415098—WELL-CONSTRUCTION dwg 10/15/2004 3 09 58 PM PDT <br />