Ellf�yt� <br /> • Mr James Barton <br /> November 2, 2004 <br /> Page 4 <br /> benzene, toluene, ethylbenzene, and total xylenes (BTEX) using EPA Method 8021, total <br /> petroleum hydrocarbons as gasoline (TPHg) by EPA Method 8015 Modified and methyl tertiary <br /> butyl ether (MtBE), 1,2—dlchloroethane (1,2-DCA), and 1,2—dibromoethane (EDB) using EPA <br /> Method 8260B Additionally, selected samples will be analyzed for total lead using EPA Method <br /> 6010B for waste disposal purposes Field methods and procedures to be used by ENSR during <br /> drilling and installation of the proposed well are summarized in Attachment B <br />' Groundwater Monitoring Well Installation <br /> The groundwater monitoring wells will be constructed using 2-inch diameter, flush-threaded, <br /> Schedule 40 PVC casing The casing for well MW-31 will be installed to a total depth of <br /> approximately 90 feet bgs The well will be screened from 85 to 90 feet bgs with a 0 02-inch <br /> machine-slotted casing The casing for well MW-32 will be installed to a total depth of <br /> approximately 103 feet bgs The well will be screened from 98 to 103 feet bgs with a 0 02-Inch <br /> machine-slotted casing Final screened Intervals will be based on field observations The <br /> annular space for each well will be filled with No 3 Lonestar, or equivalent, sand (filter pack) <br /> from the maximum depth of the well to 2 feet above the top of the well screens A minimum of <br /> 2-foot thick bentonite seal will be placed above each filter pack Above the upper bentonite seal <br /> to 1 foot bgs the annular space will be sealed with neat cement grout A concrete surface seal <br /> will be Installed to set the traffic rated vault boxes Proposed well construction details are <br /> presented in Figure 3 <br /> Soil Stockpile <br /> It is anticipated that drilling activities will generated approximately 20 cubic yards of soil <br /> cuttings The cuttings will be placed in 55-gallon DOT-rated drums and temporarily stored <br /> onsite It is anticipated that the drums containing soil drill cuttings and drums containing rinse <br /> water will be transported as non hazardous waste to an approved facility within 90-days <br /> Well Development and Groundwater Sampling <br /> The newly installed groundwater monitoring wells will be developed a minimum of 72 hours after <br /> their installation This will allow the neat cement grout seal time to cure The wells will be <br /> developed using a surge block and submersible pump Groundwater samples will be collected <br /> from the monitoring wells following development a minimum of 24 hours after development is <br /> completed Groundwater samples will be submitted to a state-certified laboratory under chain of <br /> custody protocol for analysis of TPHg using EPA Method 8015M, and BTEX, MtBE, 1,2 DCA, and <br /> EDB by EPA Method 8260B Additionally, groundwater samples from wells MW-31 and MW-32 <br /> will be analyzed for concentrations of nitrates, sulfates, iron (II), and manganese (II) using <br /> previously described methods Dissolved oxygen readings will--also—be—collected-from-wells- <br /> MW-31 <br /> IIL_aiso_be—collectedfromwells_MW-31 and MW-32 <br /> 11DcsacramentolprojectslProjects10694015098-293TinaAReportslWork PlansM%Work Plan-SVE AS System doe <br /> ^i ;.t' - 'I c Ypc+r <br /> ^,Z' I��.,-- , `7".,,,m�nf� <br />