My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008006
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
5606
>
2900 - Site Mitigation Program
>
PR0541401
>
ARCHIVED REPORTS_XR0008006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2020 2:25:29 PM
Creation date
4/14/2020 1:26:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008006
RECORD_ID
PR0541401
PE
2950
FACILITY_ID
FA0006046
FACILITY_NAME
UNION OIL STATION #5098
STREET_NUMBER
5606
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
02
SITE_LOCATION
5606 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<L %'J California Regional Water Quality Control Board <br /> Central Valley Region ' <br /> Robert Schneider Chair <br /> Terry Tamminen Arnold Schwarzenegger <br /> Secretary for Sacramento Main Office Governor <br /> Environments] lntanet Address httpJ/www swmb.aa govH"&5 RECEIVE[ <br /> i <br /> Protection 11020 Sun Center Dnvo#200 Rancho Cordova,CA 95670-6114 <br /> Phone(916)464-3291 OCT Q $ 1004 <br /> a October 2004 <br /> i <br /> Mr Bob Hopkins Mr ray Allen <br /> Union Oil Company of California Stone Brothers Management Company <br /> 276 Tank Farm Road 1024 W Robinhood Dr. <br /> P O Box 1069 Stockton,CA 95207 <br /> San Luis Obispo,CA 93406 <br /> l� <br /> LETTER REQUEST, CLEANUP AND ABATEMENT ORDER (CAO)NO. 5-00-70Zi-FORMER UNOCAL <br /> STATION#5098 AT 5606 PACIFIC AVENUE,AND FORMER MONTGOMERY WARDS AUTO SERVICE <br /> AT 5400 PACIFIC AVENUE,STOC%TON,SAN JOA 9 UIN CO UNTY, j <br /> Regional Board staff reviewed the 15 September 2004 Request for Extension to Restart SVE System and <br /> Evaluation of Potential Enhancement to SVE System (Letter), submitted by Unocal The Letter proposes a date <br /> of 15 January 2005 for submitting a report reconrnnending a proposal for enhancement to the existing SVEiAS <br /> system,to help cease plume movement <br /> 10 Background My letter dated 15 May 2004 requested a Workplan by 15 June 2004,to comply with <br /> CAO No 5-00-707,Order No 15, which states "If groundwater monitoring indicates that the groundwater <br /> plume has migrated beyond laterally or vertically defined limits during the quarter, the quarterly report shall <br /> include a workplan and schedule, with work to begin within 30 days of a report submittal, to define the new <br /> plume limits and cease plume movement The Workplan,received 15 June 2004, did not include a schedule to <br /> begin work to redefining the limits of the groundwater plume within 30 days A Notice of Violation(NOV) for <br /> CAO No 5-00-707 was issued on 18 June 2004 The NOV required implementation of the approved Workplan <br /> by 15 July 2004, and also required submittal of a Report by 1 August 2004, showing the steps taken to.cease <br /> plume movement You did comply with both NOV deadlines by installing the monitoring wells and providing <br /> the Report,which redefined the limits of the groundwater plume and began the process for restarting the SVE/Air <br /> S system. On 14 June 2004 the Air S ar AS system was overhauled and restarted The SVE <br /> PargmB Y � P i?�g( ) Y <br /> system required anew air permit, and was scheduled to start by 15 September 2004 The Soil Vapor Extraction <br /> (SVE) system was restarted on 28 September 2004,per email notification received from your consultant ENSR <br /> International Inc (ENSR) Additionally,in a phone discussion on 3 September 2004,ENSR proposed enhancing <br /> the SVE/AS remediation by In-Situ Chemical Oxidation, specifically Ozone Injection Since additional time <br /> would be required to evaluate an injection of an In-Situ Chemical Oxidation substance,I suggested that ENSR <br /> begin the process by providing a baseline analysis using site soil and groundwater,prior to submitting a <br /> Workplan for a bench scale testing for ozone uijection A pilot study for ozone injection into the aquifer would <br /> also be necessary ENSR provided email copies of the preliminary baseline analyses on 28 September 2004 <br /> I concur to the proposed 15 January 2005 deadline to provide a Report of the assessment of SVE/AS <br /> enhancement,provided the following due dates are met <br /> -0—By-15 October-2004 Tsubmit a-Workplan outlining-the entire process-for-enhancement to-the existing— <br /> SVE/AS <br /> xisting SVE/AS P cease plume s stern,to het movement Also,I have reviewed existing data and request <br /> i0 Y <br /> inclusion of additional monitoring wells needed to enhance the vertical and lateral extent of <br /> contaminants Specifically, adequate characterization is needed to show groundwater flow direction and <br /> California Environmental Protection Agency <br /> eA Recyckd Paper <br />
The URL can be used to link to this page
Your browser does not support the video tag.