My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MONTE DIABLO
>
2894
>
2900 - Site Mitigation Program
>
PR0545578
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2020 3:13:59 PM
Creation date
4/14/2020 2:21:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0545578
PE
2950
FACILITY_ID
FA0005724
FACILITY_NAME
STOCKTON ASSEMBLY SITE
STREET_NUMBER
2894
STREET_NAME
MONTE DIABLO
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
CURRENT_STATUS
02
SITE_LOCATION
2894 MONTE DIABLO AVE
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
rEC <br /> Northwestern Equipment & Supply Co.►=` <br /> 635-641 Gilman Street <br /> Berkeley,California 94710 <br /> Phone(415)527-4080 <br /> FAX:(415)527-4164 <br /> November 30, 1989 <br /> SAN JOAQUIN LOCAL HEALTH DISTRICT <br /> 1601 East Hazelton Avenue <br /> Stockton, CA 95201 <br /> Attn: Elenore Ratcliff <br /> Subject: Work Plan <br /> The following is our work plan for: <br /> Location: 2894 West Monte Diablo Avenue, Stockton, CA <br /> Property Owners: BP Pipelines, Cleveland, OH <br /> Purpose: to determine soil conditions for potential property sale <br /> Work to be performed: Northwestern Equipment & Supply Company <br /> (NESCO) will hire Kleinfelders, Stockton office, to provide the <br /> drill rig, operator, helper and geologist to perform the boring and <br /> lab work. <br /> Two (2) holes will be bored, 1 at location B-1 and another at B-4 <br /> as referenced on the attached plot plan. Depth at location B-1 will <br /> be 12' and 3' at location B-4. Two samples will be taken at each <br /> boring. Samples will be tested per EPA Merhod 8010. <br /> Soil cuttings will be placed in a drum until the soil test results are <br /> known. <br /> Borings will eb filled with a 9 sack neat cement with 5% bentonite <br /> powder mix. <br /> A report of the test results will be made available. <br /> Should you have any questions, please feel free to call me at the <br /> number shown above. <br /> Sincerely <br /> David Garn , Manager <br />
The URL can be used to link to this page
Your browser does not support the video tag.