My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
2900
>
1600 - Food Program
>
PR0541414
>
COMPLIANCE INFO_2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2020 5:03:25 AM
Creation date
4/14/2020 3:18:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
COMPLIANCE INFO
FileName_PostFix
2018
RECORD_ID
PR0541414
PE
1635
FACILITY_ID
FA0023731
FACILITY_NAME
GG'S PIZZA
STREET_NUMBER
2900
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
14320020
CURRENT_STATUS
01
SITE_LOCATION
2900 E HARDING WAY
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SShih
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ical Installation <br /> i <br /> Ia! <br /> o�4� <br /> i <br /> i <br /> T. YLINDER CONTROL UNIT—Integral design requires no separate ;,REMOTE MANUAL PULL STATION—Simple operating instructions <br /> re ase pressure cylinder;separate wire cable activation lines for with a double action release avoids careless system discharge;a Igo` <br /> au matic fusible link and optional remote pull station provide an wire cable run with%6 inch cable and 40 corner pulleys maximum; <br /> ad ied measure of safety;an easily accessible manual release mechanism a dedicated wire cable input line to the cylinder control head provides a <br /> wick provides an option to the automatic fusible link and,depending true back-up in the event fusible links are fouled. <br /> o local codes,can be used in place of a remote manual pull station; <br /> ut ique fool proof technique for achieving necessary input wire cable ti.FUSIBLE LINK KITS—Accommodates both series and terminal <br /> to ion. placement to minimize inventory and simplify ordering;all necessary <br /> components included for efficient assembly and installation.Fusible <br /> 2. PIPING—Unbalanced piping nctwork simplifies application design links rated for maximum ambient temperature must be ordered <br /> ar 3 installation;no separate piping to connect system pressure separately.20 fusible links on a r5o'wire cable run with 4o corner <br /> cy.indtrs to extinguishing agent container.Schedule 40 stainless, pulleys maximum provides substantial hazard coverage. <br /> cl rome-plated and black pipe can be used. <br /> -.AUTOMATIC GAS SHUT-OFF VALVE—Complies with requirements <br /> YLINDER$(DOT-4B-225 RATED)—Contain Protex Potassium. pertaining to the shut-off of fuel as described by NFYA 17A;after <br /> C rbonate Solution stored at zz5 prig;pressure gauge for visual regular maintenance/service check can be reset at control head for <br /> intenancc checks;1.6,3.0,4.5,and b.o gallon sizes provide 5,Io, convenience of service technician;a coo wire cable run with 30 corner <br /> IS and ao flow point coverage respectively,offering a broad range of pulleys maximum provides mounting flexibility. <br /> al plication coverage. <br /> `S.CORNER PULLEYS ANn AccEssORI£s—Designed to ensure reliable <br /> .;.NOZZLES—Fixed and Swivel head nozzles have been established to system function,as tested by Underwriters Laboratories. <br /> r ax placement tolerances. <br /> Heiser Logistics • 2370 Firehall Road • PO Box 730 • Canandaigua,NY 14424 <br /> Phone 1.800.828.9638;Fax 1.800.782.2937 <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.